§ 39-36-7. Thermal energy network taskforce.

(a) The PUC shall form a thermal energy network taskforce, which shall be an advisory committee to evaluate the results of the feasibility studies conducted in accordance with § 39-36-4 and any pilot project undertaken in accordance with § 39-36-5. The taskforce shall meet not less than quarterly at the PUC and shall be comprised of eleven (11) members appointed by the PUC, which shall include: the commissioner of the office of energy resources, or designee; the administrator of the division of public utilities and carriers, or designee; the president of the Rhode Island AFL-CIO, or designee; the president of the Rhode Island building & construction trades council, or designee; four (4) members from a public utility that is subject to the provisions of this chapter, appointed by the chairperson of the PUC; one representative of utility workers and one representative of steelworkers, each appointed by the president of the Rhode Island AFL-CIO; and one member of the public appointed by the chairperson of the PUC who shall be selected to ensure balanced representation of the following interests and areas of expertise:

(1) Community, environmental and climate justice organizations or advocates; and

(2) State or municipal policy and planning, including in connection with energy, environment, and infrastructure.

(b) The taskforce shall provide periodic written updates on the status and insights from the feasibility studies and any pilot projects.

(c) The purpose of said taskforce shall be to advise the PUC and public utility on the deployment of thermal energy and thermal energy networks throughout the state. As such, the taskforce shall:

(1) Identify and align funding mechanisms (federal, state, rate-based, and private);

(2) Recommend coordination among utilities, municipalities, and private developers;

(3) Advise on workforce transition and labor standards;

(4) Recommend locations and models for pilots and permanent projects; and

(5) Create a framework to guide the state in planning for the expansion and accelerated deployment of thermal energy and thermal energy network systems, including recommendations for statewide infrastructure planning, integration with existing utility assets, and prioritization of environmental justice focus areas.

(d) The taskforce shall submit a written report to the PUC, DEM, OER, and the general assembly no later than eighteen (18) months following its receipt of the complete results from the feasibility studies, which report shall include, but not be limited to, findings and actionable recommendations for consideration in state planning and regulatory processes, including pertaining to the following:

(1) Creation of fair market access rules for utility-owned thermal energy networks to accept thermal energy that aligns with the climate justice, just transition, and greenhouse gas emissions reductions requirements of chapter 6.2 of title 42 (“2021 act on climate”) and that does not increase greenhouse gas emissions or co-pollutants;

(2) Criteria for cost-effectiveness;

(3) Potential rate structures for thermal energy networks;

(4) Promotion of the training and transition of workers in the fossil fuel industry impacted by this chapter; and

(5) The establishment of equitable rules for cost recovery by utilities for thermal energy networks.

(e) The taskforce shall expire six (6) months following the delivery of the report identified in subsection (d) of this section, unless extended by the general assembly.

History of Section.
P.L. 2026, ch. 339, § 1, effective June 24, 2026; P.L. 2026, ch. 340, § 1, effective June 24, 2026.