§ 39-36-4. Feasibility studies and recovery of approved implementation costs.
(a) Upon passage, the public utility shall, within twelve (12) months of June 24, 2026, identify no fewer than two (2) and no more than twelve (12) potential locations for thermal energy network feasibility studies representing diverse geographies and building types. Within eighteen (18) months of June 24, 2026, the public utility shall commence at least two (2) feasibility studies relating to the selected locations.
(b) At least one location considered shall be located within or directly benefit an environmental justice focus area, as defined in § 39-36-3 as determined by the department of environmental management.
(c) In evaluating the locations to determine which location(s) should be subject to a feasibility study, the public utility shall consider:
(1) Greenhouse gas emissions reductions;
(2) Cost-effectiveness, including projected energy-cost savings and operations and maintenance costs over the useful life of the equipment;
(3) Potential engineering and design requirements;
(4) Potential operations and maintenance requirements;
(5) Ownership of buildings or facilities receiving network benefits; and
(6) The degree to which the project benefits communities experiencing disproportionate environmental or public-health burdens.
(d) In developing the initial list of locations to study, the public utility shall consider diversity in geography, customer class, and average annual consumption of thermal energy. The list shall include for consideration the following areas:
(1) The Port of Providence and neighboring communities;
(2) Residential, hospital, and healthcare facilities;
(3) Lower South Providence;
(4) Facilities within the jurisdiction of the Rhode Island Convention Center Authority;
(5) Facilities within the jurisdiction of the Quonset Development Corporation;
(6) University of Rhode Island campuses;
(7) Aquidneck Island;
(8) The Port of Galilee; and
(9) Pastore Center Campus.
(e) All costs reasonably incurred by utilities in connection with its compliance with this chapter shall be fully recoverable by said utility. Provided, however, that each utility shall endeavor to secure available non-ratepayer funding, including from federal or state grants, subsidized loans, or tax credits to reduce said costs. To the extent a utility receives such funding support, the cost recovered pursuant to this subsection shall be offset by the amount of such funding support.
(f) Without limiting the generality of subsection (e) of this section, the PUC shall authorize recovery of reasonable and prudently incurred costs associated with planning and feasibility studies for thermal energy network projects, provided that:
(1) Such recovery shall be conditioned upon the utility’s demonstration that it has pursued available non-ratepayer funding, including federal or state grants, tax credits, or low-interest financing; and
(2) The PUC shall ensure that any rate recovery is just, reasonable, and limited so as not to impose an undue burden on ratepayers.
(g) The PUC may authorize the public utility to use or leverage existing demand side management charge pursuant to § 39-2-1.2 for planning, design, and construction of thermal-energy networks.
(h) The utility may draw upon available state funding including, but not limited to, the office of energy resources (“OER”) and Rhode Island infrastructure bank (“RIIB”) programs and incentives, as well as federal technical-assistance programs to support such studies.
(i) The OER may use Lead by Example (LBE) program funds and other state assistance to support feasibility and engineering studies requested by utilities, municipalities, or public-private partnerships.
History of Section.
P.L. 2026, ch. 339, § 1, effective June 24, 2026; P.L. 2026, ch. 340, § 1, effective
June 24, 2026.