It is enacted by the General Assembly as follows: | |
1 | SECTION 1. Title 39 of the General Laws entitled "PUBLIC UTILITIES AND |
2 | CARRIERS" is hereby amended by adding thereto the following chapter: |
3 | CHAPTER 36 |
4 | PORTABLE SOLAR GENERATION DEVICE |
5 | 39-36-1. Definitions. |
6 | When used in this chapter, these terms shall have the following meanings: |
7 | (1) "Annualized billing period" means: |
8 | (i) A twelve (12) month billing cycle beginning on April 1 of one year and ending on March |
9 | 31 of the following year; or |
10 | (ii) An additional twelve (12) month billing cycle as defined by an electrical corporation's |
11 | net metering tariff or rate schedule. |
12 | (2) "Customer-generated electricity" means electricity that: |
13 | (i) Is generated by a customer generation system for a customer participating in a net |
14 | metering program; |
15 | (ii) Exceeds the electricity the customer needs for the customer's own use; and |
16 | (iii) Is supplied to the electrical corporation administering the net metering program. |
17 | (3) "Customer generation system" means: |
18 | (i) An eligible facility that is used to supply energy to or for a specific customer that: |
| |
1 | (A) Has a generating capacity of: |
2 | (I) More than one thousand two hundred watts (1,200 W) but not more than twenty-five |
3 | kilowatts (25 kW) for a residential facility; or |
4 | (II) Not more than two megawatts (2 MW) for a non-residential facility, unless the |
5 | governing authority approves a greater generation capacity; |
6 | (B) Is located on, or adjacent to, the premises of the electrical corporation's customer, |
7 | subject to the electrical corporation's service requirements; |
8 | (C) Operates in parallel and is interconnected with the electrical corporation's distribution |
9 | facilities; |
10 | (D) Is intended primarily to offset part or all of the customer's requirements for electricity; |
11 | and |
12 | (E) Is controlled by an inverter; |
13 | (ii) Includes an electric generator and its accompanying equipment package; and |
14 | (iii) Does not include a portable solar generation device. |
15 | (4) "Eligible facility" means a facility that uses energy derived from one of the following |
16 | to generate electricity: |
17 | (i) Solar photovoltaic and solar thermal energy; |
18 | (ii) Wind energy; |
19 | (iii) Hydrogen; |
20 | (iv) Organic waste; |
21 | (v) Hydroelectric energy; |
22 | (vi) Waste gas and waste heat capture or recovery; |
23 | (vii) Biomass and biomass byproducts, except for the combustion of: |
24 | (A) Wood that has been treated with chemical preservatives such as creosote, |
25 | pentachlorophenol, or chromated copper arsenate; or |
26 | (B) Municipal waste in a solid form; |
27 | (viii) Forest or rangeland woody debris from harvesting or thinning conducted to improve |
28 | forest or rangeland ecological health and to reduce wildfire risk; |
29 | (ix) Agricultural residues; |
30 | (x) Dedicated energy crops; |
31 | (xi) Landfill gas or biogas produced from organic matter, wastewater, anaerobic digesters, |
32 | or municipal solid waste; or |
33 | (xii) Geothermal energy. |
34 | (5) "Electric distribution company" or "electrical corporation" means and shall be defined |
| LC005349 - Page 2 of 5 |
1 | as set forth in § 39-1-2. |
2 | (6) "Equipment package" means a group of components connecting an electric generator |
3 | to an electric distribution system, including all interface equipment and the interface equipment's |
4 | controls, switchgear, inverter, and other interface devices. |
5 | (7) "Excess customer-generated electricity" means the amount of customer-generated |
6 | electricity in excess of the customer's consumption from the customer generation system during a |
7 | monthly billing period, as measured at the electrical corporation's meter. |
8 | (8) "Fuel cell" means a device in which the energy of a reaction between a fuel and an |
9 | oxidant is converted directly and continuously into electrical energy. |
10 | (9) "Governing authority" means: |
11 | (i) For a distribution electrical cooperative, its board of directors; and |
12 | (ii) For each other electrical corporation, the division as defined in § 39-1-2. |
13 | (10) "Inverter" means a device that: |
14 | (i) Converts direct current power into alternating current power that is compatible with |
15 | power generated by Rhode Island Energy or other servicing electrical corporation; and |
16 | (ii) Has been designed, tested, and certified to UL1741 and installed and operated in |
17 | accordance with the latest revision of IEEE1547, as amended. |
18 | (11) "Net electricity" means the difference, as measured at the meter owned by the |
19 | electrical corporation between: |
20 | (i) The amount of electricity that an electrical corporation supplies to a customer |
21 | participating in a net metering program; and |
22 | (ii) The amount of customer-generated electricity delivered to the electrical corporation. |
23 | (12) "Net metering" means and shall be defined as set forth in § 39-26.4-3. |
24 | (13) "Net metering program" means a program administered pursuant to the provisions of |
25 | chapter 26.4 if title 39. |
26 | (14) "Portable solar generation device" means a moveable photovoltaic generation device |
27 | that: |
28 | (i) Has a maximum power output of not more than one thousand two hundred watts (1,200 |
29 | W); |
30 | (ii) Is designed to be connected to a building's electrical system through a standard one |
31 | hundred twenty volt (120 V) alternating current outlet; |
32 | (iii) Is intended primarily to offset part of the customer's electricity consumption; |
33 | (iv) Meets the standards of the most recent version of the National Electrical Code; and |
34 | (v) Is certified by Underwriters Laboratories or an equivalent nationally recognized testing |
| LC005349 - Page 3 of 5 |
1 | laboratory. |
2 | (15) "Switchgear" means the combination of electrical disconnects, fuses, or circuit |
3 | breakers: |
4 | (i) Used to: |
5 | (A) Isolate electrical equipment; and |
6 | (B) De-energize equipment to allow work to be performed or faults downstream to be |
7 | cleared; and |
8 | (ii) That is: |
9 | (A) Designed, tested, and certified to UL1741; and |
10 | (B) Installed and operated in accordance with the latest revision of IEEE1547, as amended. |
11 | 39-36-2. Portable solar generation device -- Exemptions -- Requirements. |
12 | (a) A portable solar generation device that meets the requirements of this chapter is exempt |
13 | from the interconnection requirements described in chapter 26.4 of title 39 and the requirements is |
14 | to enter into a interconnection agreement pursuant to chapter 26.4 of title 39. |
15 | (b) A portable solar generation device shall include a device or feature that prevents the |
16 | system from energizing the building's electrical system during a power outage. |
17 | (c) An electrical corporation: |
18 | (1) May not require a customer using a portable solar generation device to: |
19 | (i) Obtain the electrical corporation's approval before installing or using the system; |
20 | (ii) Pay any fee or charge related to the system; or |
21 | (iii) Install any additional controls or equipment beyond what is integrated into the system; |
22 | and |
23 | (2) Is not liable for any damage or injury caused by a portable solar generation device. |
24 | SECTION 2. This act shall take effect upon passage. |
======== | |
LC005349 | |
======== | |
| LC005349 - Page 4 of 5 |
EXPLANATION | |
BY THE LEGISLATIVE COUNCIL | |
OF | |
A N A C T | |
RELATING TO PUBLIC UTILITIES AND CARRIERS -- PORTABLE SOLAR | |
GENERATION DEVICE | |
*** | |
1 | This act would create a new category of residential solar energy generation for small |
2 | portable solar generation devices. |
3 | This act would take effect upon passage. |
======== | |
LC005349 | |
======== | |