2025 -- H 5450 | |
======== | |
LC001198 | |
======== | |
STATE OF RHODE ISLAND | |
IN GENERAL ASSEMBLY | |
JANUARY SESSION, A.D. 2025 | |
____________ | |
A N A C T | |
RELATING TO PUBLIC PROPERTY AND WORKS -- ALL-ELECTRIC BUILDING ACT | |
| |
Introduced By: Representatives Handy, Cortvriend, Kislak, Stewart, McGaw, Speakman, | |
Date Introduced: February 12, 2025 | |
Referred To: House Municipal Government & Housing | |
It is enacted by the General Assembly as follows: | |
1 | SECTION 1. Title 37 of the General Laws entitled "PUBLIC PROPERTY AND WORKS" |
2 | is hereby amended by adding thereto the following chapter: |
3 | CHAPTER 27 |
4 | ALL-ELECTRIC BUILDING ACT |
5 | 37-27-1. Short title. |
6 | This chapter shall be known and may be cited as the "All-Electric Building Act". |
7 | 37-27-2. Definitions. |
8 | As used in this chapter: |
9 | (1) "All-electric building or project" means a building or project that uses a permanent |
10 | supply of electricity, as the sole source of energy to meet its building energy needs. An all-electric |
11 | building or project shall have no natural gas, propane, or oil heaters, boilers, piping systems, |
12 | fixtures or infrastructure installed to meet building energy needs. |
13 | (2) "All-electric ready" means a building, project, or portion thereof, that contains electrical |
14 | systems and designs that provide sufficient capacity for a future retrofit of a mixed-fuel building to |
15 | an all-electric building, including sufficient space, drainage, electrical conductors or raceways, bus |
16 | bar capacity, and overcurrent protective devices for such retrofit. The public utilities commission, |
17 | in conjunction with the office of housing and community development and the state building code |
18 | commission, shall promulgate guidelines for an electric-ready building on or before January 1, |
19 | 2026. |
| |
1 | (3) "Building energy needs" means all space conditioning including heating and cooling, |
2 | water heating including pools and spas, cooking appliances and clothes drying appliances. |
3 | (4) "Mixed-fuel building" means a building that uses a combination of electricity and |
4 | natural gas, propane, or oil to meet its building energy needs. For the purposes of this section, |
5 | "mixed-fuel building" shall not include buildings that use geothermal or solar energy to meet their |
6 | heating and/or cooling building energy needs; provided, however, that are otherwise, all-electric |
7 | buildings. |
8 | (5) "Mixed-use building" means a building used for both residential and commercial |
9 | purposes. |
10 | 37-27-3. Permits for all-electric buildings. |
11 | (a) No city or town shall issue a permit for the construction of any new commercial, |
12 | residential, or mixed-use building, that is not an all-electric building, if the initial application for |
13 | such permit was submitted after December 31, 2026, unless the circumstances set forth in |
14 | subsection (b) or (e) of this section apply. For purposes of this subsection, the initial application |
15 | shall be the first site or building permit application, associated with the building or project. |
16 | (b) Notwithstanding the provisions of subsection (a) of this section, a city or town may |
17 | issue a permit for construction of a new mixed-fuel building upon a finding by the permitting body |
18 | of such city or town, that constructing an all-electric building or project is physically or technically |
19 | infeasible and that a modification is warranted. Financial considerations shall not be a sufficient |
20 | basis to determine physical or technical infeasibility. Modifications shall only be issued under this |
21 | exception where the permitting body finds that: |
22 | (1) Sufficient evidence was submitted to substantiate the infeasibility of an all-electric |
23 | building or project design. Such evidence shall show that the building either: |
24 | (i) Cannot satisfy necessary building code requirements, without the usage of gas or oil |
25 | piping systems, fixtures and/or infrastructure; or |
26 | (ii) If the building is specifically designated for occupancy by a commercial food service |
27 | establishment, that such establishment cannot feasibly operate using commercially available all- |
28 | electric appliances; |
29 | (2) The installation of natural gas or oil piping systems, fixtures and/or infrastructure is |
30 | strictly limited to the system and area of the building for which an all-electric building or project |
31 | design is infeasible; |
32 | (3) The area or service within the project where gas or oil piping systems, fixtures and/or |
33 | infrastructure are installed, is all-electric ready; and |
34 | (4) The project's modified design provides equivalent health, safety and fire protection to |
| LC001198 - Page 2 of 4 |
1 | an all-electric building or project design. |
2 | (c) No local permitting body shall issue building or construction permits that would convert |
3 | an all-electric building or project into a mixed-fuel building where the initial application was |
4 | submitted after December 31, 2026. |
5 | (d) On or before February 1, 2027, the public utilities commission, the office of housing |
6 | community development and the state building code commission, shall report jointly to the |
7 | governor, the senate president, and the speaker of the house, regarding what changes to electric rate |
8 | designs, new or existing subsidy programs, policies, or laws, are necessary to ensure this section |
9 | does not diminish the production of affordable housing or the affordability of electricity for |
10 | customers in all-electric buildings. For the purpose of this subsection, "affordability of electricity" |
11 | means that electricity does not cost more than six percent (6%) of a residential customer's income. |
12 | (e) Exemptions. Notwithstanding the provisions of subsection (a) of this section, a city or |
13 | town shall issue a permit for new construction, substantial remodel, or rehabilitation of a building |
14 | or group of buildings, in which the use of mixed-fuel is used, to meet building energy needs and |
15 | said building or group of buildings, are for the sole use as a hospital, medical facility, laboratory |
16 | for biological research or restaurant. |
17 | SECTION 2. This act shall take effect upon passage. |
======== | |
LC001198 | |
======== | |
| LC001198 - Page 3 of 4 |
EXPLANATION | |
BY THE LEGISLATIVE COUNCIL | |
OF | |
A N A C T | |
RELATING TO PUBLIC PROPERTY AND WORKS -- ALL-ELECTRIC BUILDING ACT | |
*** | |
1 | This act would provide that no city or town may issue a permit for the construction of new |
2 | buildings, that are not an all-electric building, if the initial application for a permit was submitted |
3 | after December 31, 2026, unless certain circumstances apply. Exceptions would be granted to |
4 | restaurants, hospitals, medical facilities or biolabs. |
5 | This act would take effect upon passage. |
======== | |