H O U S E R E S O L U T I O N | |
RESPECTFULLY REQUESTING THE US ARMY CORPS OF ENGINEERS TO STUDY | |
AND PROVIDE RECOMMENDATIONS TO RESTORE THE OPERATIONAL | |
EFFECTIVENESS OF THE POINT JUDITH BREAKWATER | |
| |
Introduced By: Representative P. Morgan | |
Date Introduced: March 05, 2024 | |
Referred To: House State Government & Elections | |
1 | WHEREAS, Point Judith Harbor breakwater is a partial border between the communities |
2 | of Narragansett and South Kingstown, and connects Point Judith Harbor with the Atlantic by a |
3 | narrow waterway that cuts through the beaches and sandy shoreline; and |
4 | WHEREAS, Used by a large fishing fleet and local and transient recreational craft, Point |
5 | Judith Harbor handles a large amount of passenger traffic, primarily during the summer; and |
6 | WHEREAS, Original work on the breakwater for the Point Judith Harbor dates back to |
7 | 1905, and in 1914, additional breakwater projects were completed, with updates in 1950 and |
8 | 1977; and |
9 | WHEREAS, The breakwater work consists of a 6,970-foot-long main stone breakwater in |
10 | Point Judith Harbor, a 2,240-foot-long stone breakwater extending southwesterly from Point |
11 | Judith, and a 3,640-foot-long stone breakwater extending southerly from the entrance to Point |
12 | Judith Pond. These three structures provide shelter for refuge, search and rescue operations, a |
13 | commercial harbor, and a sandy, recreational shoreline; and |
14 | WHEREAS, When first constructed, the structure reached over 8-10 feet above the water |
15 | line but is now easily overwhelmed by waves, leaving the surrounding area inadequately |
16 | protected from storms and rising sea levels; and |
17 | WHEREAS, Over the past 46 years, these barriers have received no maintenance or |
18 | repair and have suffered significant damage due to wave erosion and neglect, leaving them in a |
19 | severely damaged state, and with questionable functional efficiency compared to the as-built |
| |
1 | condition; and |
2 | WHEREAS, The safety of our State’s fishing fleet, docks and the surrounding homes and |
3 | businesses are threatened by the degradation of the barrier structure; now, therefore be it |
4 | RESOLVED, That this House of Representatives of the State of Rhode Island hereby |
5 | requests that the US Army Corps of Engineers revisit the Pt. Judith breakwater and restore it to |
6 | the benefit of the area and to our State; and be it further |
7 | RESOLVED, That the Secretary of State be and hereby is authorized and directed to |
8 | transmit a duly certified copy of this resolution to the New England District, US Army Corps of |
9 | Engineers. |
======== | |