2023 -- S 0537 | |
======== | |
LC001149 | |
======== | |
STATE OF RHODE ISLAND | |
IN GENERAL ASSEMBLY | |
JANUARY SESSION, A.D. 2023 | |
____________ | |
A N A C T | |
RELATING TO EDUCATION -- SCHOOL FUNDS AND PROPERTY | |
| |
Introduced By: Senators Pearson, Gallo, Acosta, Cano, Murray, DiPalma, Ruggerio, | |
Date Introduced: March 07, 2023 | |
Referred To: Senate Finance | |
It is enacted by the General Assembly as follows: | |
1 | SECTION 1. Chapter 16-9 of the General Laws entitled "School Funds and Property" is |
2 | hereby amended by adding thereto the following section: |
3 | 16-9-11. New school construction and renovations. |
4 | (a) Not later than December 31, 2023, the department of elementary and secondary |
5 | education is hereby authorized and directed, in consultation with the office of energy resources, to |
6 | develop and adopt regulations requiring all school buildings to meet the standard of zero energy |
7 | capable, as defined in § 16-7-36, by December 31, 2035. |
8 | (1) The regulations shall allow flexibility to the furthest extent possible for local education |
9 | agencies to pursue state and federal funding sources that assist in financing energy efficiency or |
10 | renewable energy systems without any penalties or reduction in state housing aid provided by the |
11 | department of education. |
12 | (2) Furthermore, for local education agencies that pursue federal funding for renewable |
13 | energy systems, the department’s regulations shall direct and provide further guidance to local |
14 | education agencies to build, own, and operate solar panels utilizing federal guidance established in |
15 | I.R.C. § 6418(b)(1). |
16 | (b) For purposes of the section, terms used in this section shall have the same meaning as |
17 | defined in § 16-7-36. |
18 | SECTION 2. Sections 16-7-36, 16-7-40 and 16-7-41.1 of the General Laws in Chapter 16- |
19 | 7 entitled "Foundation Level School Support [See Title 16 Chapter 97 — The Rhode Island Board |
| |
1 | of Education Act]" are hereby amended to read as follows: |
2 | 16-7-36. Definitions. |
3 | The following words and phrases used in §§ 16-7-35 to 16-7-47 and in §16-9-11 have the |
4 | following meanings: |
5 | (1) “Adjusted equalized weighted assessed valuation” means the equalized weighted |
6 | assessed valuation for a community as determined by the division of property valuation within the |
7 | department of revenue in accordance with § 16-7-21; provided, however, that in the case of a |
8 | regional school district the commissioner of elementary and secondary education shall apportion |
9 | the adjusted equalized weighted assessed valuation of the member cities or towns among the |
10 | regional school district and the member cities or towns according to the proportion that the number |
11 | of pupils of the regional school district bears to the number of pupils of the member cities or towns. |
12 | (2) “Approved project” means a project which has complied with the administrative |
13 | regulations governing §§ 16-7-35 through 16-7-47, and which has been authorized to receive state |
14 | school housing reimbursement by the commissioner of elementary and secondary education. |
15 | (3) “Commissioning agent” means a person or entity who ensures that systems are |
16 | designed, installed, functionally tested, and capable of being operated and maintained to perform |
17 | in conformity with the design intent of a project. |
18 | (4) “Community” means any city, town, or regional school district established pursuant to |
19 | law; provided, however, that the member towns of the Chariho regional high school district, created |
20 | by P.L. 1958, ch. 55, as amended, shall constitute separate and individual communities for the |
21 | purposes of distributing the foundation level school support for school housing for all grades |
22 | financed in whole or in part by the towns irrespective of any regionalization. |
23 | (5) “Facilities condition index” means the cost to fully repair the building divided by the |
24 | cost to replace the building as determined by the school building authority. |
25 | (6) “Functional utilization” means the ratio of the student population within a school |
26 | facility to the capacity of the school facility to adequately serve students as defined by the school |
27 | building authority. |
28 | (7) “Maintenance expenditures” means amounts spent for repairs or replacements for the |
29 | purpose of keeping a school facility open and safe for use, including repairs, maintenance, and |
30 | replacements to a school facility’s heating, lighting, ventilation, security, and other fixtures to keep |
31 | the facility or fixtures in effective working condition. Maintenance shall not include contracted or |
32 | direct custodial or janitorial services, expenditures for the cleaning of a school facility or its |
33 | fixtures, the care and upkeep of grounds, recreational facilities, or parking lots, or the cleaning of |
34 | or repairs and replacements to movable furnishings or equipment. |
| LC001149 - Page 2 of 11 |
1 | (8) “Owner’s program manager” means owner’s program manager as defined in § 37-2-7. |
2 | (9) “Prime contractor” means the construction contractor who is responsible for the |
3 | completion of a project. |
4 | (10) “Reference year” means the year next prior to the school year immediately preceding |
5 | that in which aid is to be paid. |
6 | (11) “Subject to inflation” means the base amount multiplied by the percentage of increase |
7 | in the Producer Price Index (PPI) Data for Nonresidential Building Construction (NAICS 236222) |
8 | as published by the United States Department of Labor, Bureau of Labor Statistics determined as |
9 | of September 30 of the prior calendar year. |
10 | (12) “Zero energy capable” means the building: |
11 | (i) Meets the latest Northeast Collaborative for High Performance Schools (NE-CHPS) |
12 | standard of a zero energy capable school building whereby the actual annual energy delivered other |
13 | than as described in subsection (12)(ii) of this section, must be less than or equal to the renewable |
14 | energy generated onsite; or |
15 | (ii) The actual annual energy delivered must be less than or equal to the sum of: |
16 | (A) The renewable energy generated onsite; |
17 | (B) The renewable energy generated offsite through a power purchase agreement; and |
18 | (C) The value of purchased NE-GIS certificates that meet the standard for a new renewable |
19 | energy resources as defined in § 39-26-2. |
20 | 16-7-40. Increased school housing ratio. |
21 | (a)(1) In the case of regional school districts, the school housing aid ratio shall be increased |
22 | by two percent (2%) for each grade so consolidated. |
23 | (2) Regional school districts undertaking renovation project(s) shall receive an increased |
24 | share ratio of four percent (4%) for those specific project(s) only, in addition to the combined share |
25 | ratio calculated in § 16-7-39 and this subsection. |
26 | (b) In the case of projects undertaken by districts specifically for the purposes of school |
27 | safety and security, the school housing aid share ratio shall be increased by five percent (5%) for |
28 | these specific projects only, in the calculation of school housing aid. The increased share ratio shall |
29 | continue to be applied for as long as the project(s) receives state housing aid. In order to qualify for |
30 | the increased share ratio, seventy-five percent (75%) of the project costs must be specifically |
31 | directed to school safety and security measures. The council on elementary and secondary |
32 | education shall promulgate rules and regulations for the administration and operation of this |
33 | section. |
34 | (c) For purposes of addressing health and safety deficiencies as defined by the school |
| LC001149 - Page 3 of 11 |
1 | building authority, including the remediation of hazardous materials, the school housing aid ratio |
2 | shall be increased by five percent (5%) so long as the construction of the project commences by |
3 | December 30, 2023, is completed by December 30, 2028, and a two hundred fifty million dollar |
4 | ($250,000,000) general obligation bond is approved on the November 2018 ballot. In order to |
5 | qualify for the increased share ratio, twenty-five percent (25%) of the project costs or a minimum |
6 | of five hundred thousand dollars ($500,000) must be specifically directed to this purpose. |
7 | (d) For purposes of educational enhancement, including projects devoted to the |
8 | enhancement of early childhood education and career and technical education, the school housing |
9 | aid ratio shall be increased by five percent (5%) so long as construction of the project commences |
10 | by December 30, 2023, is completed by December 30, 2028, and a two hundred fifty million dollar |
11 | ($250,000,000) general obligation bond is approved on the November 2018 ballot. In order to |
12 | qualify for the increased share ratio, twenty-five percent (25%) of the project costs or a minimum |
13 | of five hundred thousand dollars ($500,000) must be specifically directed to these purposes. |
14 | (e) For replacement of a facility that has a facilities condition index of sixty-five percent |
15 | (65%) or higher, the school housing ratio shall be increased by five percent (5%) so long as |
16 | construction of the project commences by December 30, 2023, is completed by December 30, 2028, |
17 | does not receive a bonus pursuant to subsection (f) or subsection (g), and a two hundred fifty million |
18 | dollar ($250,000,000) general obligation bond is approved on the November 2018 ballot. In order |
19 | to qualify for the increased share ratio, twenty-five percent (25%) of the project costs or a minimum |
20 | of five hundred thousand dollars ($500,000) must be specifically directed to this purpose. |
21 | (f) For any new construction or renovation that increases the functional utilization of any |
22 | facility from less than sixty percent (60%) to more than eighty percent (80%), including the |
23 | consolidation of school buildings within or across districts, the school housing aid ratio shall be |
24 | increased by five percent (5%) so long as construction of the project commences by December 30, |
25 | 2023, is completed by December 30, 2028, and a two hundred fifty million dollar ($250,000,000) |
26 | general obligation bond is approved on the November 2018 ballot. In order to qualify for the |
27 | increased share ratio, twenty-five percent (25%) of the project costs or a minimum of five hundred |
28 | thousand dollars ($500,000) must be specifically directed to this purpose. |
29 | (g) For any new construction or renovation that decreases the functional utilization of any |
30 | facility from more than one hundred twenty percent (120%) to between eighty-five percent (85%) |
31 | to one hundred five percent (105%), the school housing ratio shall be increased by five percent |
32 | (5%) so long as construction of the project commences by December 30, 2023, is completed by |
33 | December 30, 2028, and a two hundred fifty million dollar ($250,000,000) general obligation bond |
34 | is approved on the November 2018 ballot. In order to qualify for the increased share ratio, twenty- |
| LC001149 - Page 4 of 11 |
1 | five percent (25%) of the project costs or a minimum of five hundred thousand dollars ($500,000) |
2 | must be specifically directed to this purpose. |
3 | (h) For consolidation of two (2) or more school buildings, within or across districts into |
4 | one school building, the school housing aid ratio shall be increased by five percent (5%) so long as |
5 | construction of the project commences by December 30, 2023, is completed by December 30, 2028, |
6 | a two hundred fifty million dollar ($250,000,000) general obligation bond is approved on the |
7 | November 2018 ballot, and does not receive a bonus pursuant to subsection (f) or subsection (g). |
8 | In order to qualify for the increased share ratio, twenty-five percent (25%) of the project costs or a |
9 | minimum of five hundred thousand dollars ($500,000) must be specifically directed to this purpose. |
10 | (i) Any regionalized and/or non-regionalized school district receiving an increased share |
11 | ratio for a project approved prior to July 1, 2018, shall continue to receive the increased share ratio |
12 | for as long as the project receives state housing aid. |
13 | (j)(1) For any new construction or renovation that includes energy efficiency and |
14 | renewable energy upgrades, the school housing aid ratio shall be increased by five percent (5%) so |
15 | long as a three hundred million dollar ($300,000,000) general obligation bond is approved on the |
16 | November 2022 ballot and does not receive a bonus pursuant to subsection (j)(2) of this section. |
17 | (i) In order for new construction to qualify for the increased share ratio: |
18 | (A) The project shall achieve a maximum energy use intensity (EUI) of thirty (30) kBtu |
19 | per square foot per year; or |
20 | (B) Twenty-five percent (25%) of the project costs or a minimum of one million dollars |
21 | ($1,000,000) shall be specifically directed to this purpose. |
22 | (ii) In order for a renovation to qualify for the increased share ratio: |
23 | (A) The project shall achieve a maximum energy use intensity (EUI) of thirty-seven (37) |
24 | kBtu per square foot per year; or |
25 | (B) Twenty-five percent (25%) of the project costs or a minimum of one million dollars |
26 | ($1,000,000) shall be specifically directed to this purpose. |
27 | (2) For any new construction or renovation that includes energy efficiency and renewable |
28 | energy upgrades for the building to meet the definition of a zero energy capable school building |
29 | pursuant to § 16-7-36, the school housing aid ratio shall be increased by ten percent (10%) so long |
30 | as a three hundred million dollar ($300,000,000) general obligation bond is approved on the |
31 | November 2022 ballot and does not receive a bonus pursuant to subsection (j)(1) of this section. |
32 | In order to qualify for the increased share ratio, twenty-five percent (25%) of the project costs or a |
33 | minimum of one million dollars ($1,000,000) shall be specifically directed to this purpose. |
34 | 16-7-41.1. Eligibility for reimbursement. |
| LC001149 - Page 5 of 11 |
1 | (a) School districts, not municipalities, may apply for and obtain approval for a project |
2 | under the necessity of school construction process set forth in the regulations of the council on |
3 | elementary and secondary education, provided, however, in the case of a municipality that issues |
4 | bonds through the Rhode Island health and educational building corporation to finance or refinance |
5 | school facilities for a school district that is not part of the municipality, the municipality may apply |
6 | for and obtain approval for a project. Such approval will remain valid until June 30 of the third |
7 | fiscal year following the fiscal year in which the council on elementary and secondary education’s |
8 | approval is granted. Only those projects undertaken at school facilities under the care and control |
9 | of the school committee and located on school property may qualify for reimbursement under §§ |
10 | 16-7-35 — 16-7-47. Facilities with combined school and municipal uses or facilities that are |
11 | operated jointly with any other profit or nonprofit agency do not qualify for reimbursement under |
12 | §§ 16-7-35 — 16-7-47. Projects completed by June 30 of a fiscal year are eligible for |
13 | reimbursement in the following fiscal year. A project for new school housing or additional housing |
14 | shall be deemed to be completed when the work has been officially accepted by the school |
15 | committee or when the housing is occupied for its intended use by the school committee, whichever |
16 | is earlier. |
17 | (b) Notwithstanding the provisions of this section, the board of regents shall not grant final |
18 | approval for any project between June 30, 2011, and May 1, 2015, except for projects that are |
19 | necessitated by immediate health and safety reasons. In the event that a project is requested during |
20 | the moratorium because of immediate health and safety reasons, those proposals shall be reported |
21 | to the chairs of the house and senate finance committees. |
22 | (c) Any project approval granted prior to the adoption of the school construction |
23 | regulations in 2007, and which are currently inactive; and any project approval granted prior to the |
24 | adoption of the school construction regulations in 2007 which did not receive voter approval or |
25 | which has not been previously financed, are no longer eligible for reimbursement under this |
26 | chapter. The department of elementary and secondary education shall develop recommendations |
27 | for further cost containment strategies in the school housing aid program. |
28 | (d) Beginning July 1, 2015, the council on elementary and secondary education shall |
29 | approve new necessity of school construction applications on an annual basis. The department of |
30 | elementary and secondary education shall develop an annual application timeline for local |
31 | education agencies seeking new necessity of school construction approvals. |
32 | (e) Beginning July 1, 2019, no state funding shall be provided for projects in excess of ten |
33 | million dollars ($10,000,000) unless the prime contractor for the project has received |
34 | prequalification from the school building authority. |
| LC001149 - Page 6 of 11 |
1 | (f) Beginning July 1, 2019, the necessity of school construction process set forth in the |
2 | regulations of the council on elementary and secondary education shall include a single statewide |
3 | process, developed with the consultation of the department of environmental management, that will |
4 | ensure community involvement throughout the investigation and remediation of contaminated |
5 | building sites for possible reuse as the location of a school. That process will fulfill all provisions |
6 | of § 23-19.14-5 related to the investigation of reuse of such sites for schools. |
7 | (g) Beginning July 1, 2019, school housing projects exceeding one million five hundred |
8 | thousand dollars ($1,500,000) subject to inflation shall include an owner’s program manager and a |
9 | commissioning agent. The cost of the program manager and commissioning agent shall be |
10 | considered a project cost eligible for aid pursuant to §§ 16-7-41 and 16-105-5. |
11 | (h) Temporary housing, or swing space, for students shall be a reimbursable expense so |
12 | long as a district can demonstrate that no other viable option to temporarily house students exists |
13 | and provided that use of the temporary space is time limited for a period not to exceed twenty-four |
14 | (24) months and tied to a specific construction project. |
15 | (i) Environmental site remediation, as defined by the school building authority, shall be a |
16 | reimbursable expense up to one million dollars ($1,000,000) per project. |
17 | (j) If, within thirty (30) years of construction, a newly constructed school is sold to a private |
18 | entity, the state shall receive a portion of the sale proceeds equal to that project’s housing aid |
19 | reimbursement rate at the time of project completion. |
20 | (k) All projects must comply with § 37-13-6, ensuring that prevailing wage laws are being |
21 | followed, and § 37-14.1-6, ensuring that minority business enterprises reach a minimum of ten |
22 | percent (10%) of the dollar value of the bid, and § 37-13-3.1, ensuring apprenticeship program |
23 | utilization. |
24 | (l) Using reviewable criteria, all projects seeking school housing aid shall complete an |
25 | independent, objective, reasoned study on all projects over ten million dollars ($10,000,000) to |
26 | determine whether adoption of a project labor agreement on the proposed project or projects will |
27 | help achieve the goals of the state purchases act. |
28 | SECTION 3. Section 16-105-3 of the General Laws in Chapter 16-105 entitled "School |
29 | Building Authority" is hereby amended to read as follows: |
30 | 16-105-3. Roles and responsibilities. |
31 | The school building authority roles and responsibilities shall include: |
32 | (1) Management of a system with the goal of ensuring equitable and adequate school |
33 | housing for all public school children in the state; |
34 | (2) Prevention of the cost of school housing from interfering with the effective operation |
| LC001149 - Page 7 of 11 |
1 | of the schools; |
2 | (3) Management of school housing aid in accordance with statute; |
3 | (4) Reviewing and making recommendations to the council on elementary and secondary |
4 | education on necessity of school construction applications for state school housing aid and the |
5 | school building authority capital fund, based on the recommendations of the school building |
6 | authority advisory board; |
7 | (5) Promulgating, managing, and maintaining school construction regulations, standards, |
8 | and guidelines applicable to the school housing program, based on the recommendations of the |
9 | school building authority advisory board, created in § 16-105-8. Said regulations shall require |
10 | conformance with the minority business enterprise requirements set forth in § 37-14.1-6 and with |
11 | the latest Northeast Collaborative for High Performance Schools (NE-CHPS) standards or |
12 | equivalent, contingent on approval from the council on elementary and secondary education; |
13 | (6) Developing a prequalification and review process for prime contractors, architects, and |
14 | engineers seeking to bid on projects in excess of ten million dollars ($10,000,000) in total costs |
15 | subject to inflation. Notwithstanding any general laws to the contrary, a prequalification shall be |
16 | valid for a maximum of two (2) years from the date of issuance. Factors to be considered by the |
17 | school building authority in granting a prequalification to prime contractors shall include, but not |
18 | be limited to, the contractor’s history of completing complex projects on time and on budget, track |
19 | record of compliance with applicable environmental and safety regulations, evidence that |
20 | completed prior projects prioritized the facility’s future maintainability, and compliance with |
21 | applicable requirements for the use of women and minority owned subcontractors; |
22 | (i) At least annually, a list of prequalified contractors, architects, and engineers shall be |
23 | publicly posted with all other program information; |
24 | (7) Providing technical assistance and guidance to school districts on the necessity of |
25 | school construction application process; |
26 | (8) Providing technical advice and assistance, training, and education to cities, towns, |
27 | and/or local education agencies and to general contractors, subcontractors, construction or project |
28 | managers, designers and others in planning, maintenance, and establishment of school facility |
29 | space; |
30 | (9) Developing a project priority system, based on the recommendations of the school |
31 | building authority advisory board, in accordance with school construction regulations for the school |
32 | building authority capital fund, subject to review and, if necessary, to be revised on intervals not to |
33 | exceed five (5) years. Project priorities shall include, but not be limited to, the following order of |
34 | priorities: |
| LC001149 - Page 8 of 11 |
1 | (i) Projects to replace or renovate a building that is structurally unsound or otherwise in a |
2 | condition seriously jeopardizing the health and safety of school children where no alternative exists; |
3 | (ii) Projects needed to prevent loss of accreditation; |
4 | (iii) Projects needed for the replacement, renovation, or modernization of the HVAC |
5 | system in any schoolhouse to increase energy conservation and decrease energy-related costs in |
6 | said schoolhouse; |
7 | (iv) Projects needed to replace or add to obsolete buildings in order to provide for a full |
8 | range of programs consistent with state and approved local requirements; and |
9 | (v) Projects needed to comply with mandatory, instructional programs; |
10 | (10) Maintaining a current list of requested school projects and the priority given them; |
11 | (11) Collecting and maintaining readily available data on all the public school facilities in |
12 | the state; |
13 | (12) Collecting, maintaining, and making publicly available quarterly progress reports of |
14 | all ongoing school construction projects that shall include, at a minimum, the costs of the project |
15 | and the time schedule of the project; |
16 | (13) Recommending policies and procedures designed to reduce borrowing for school |
17 | construction programs at both state and local levels; |
18 | (14) At least every five (5) years, conducting a needs survey to ascertain the capital |
19 | construction, reconstruction, maintenance, and other capital needs for schools in each district of the |
20 | state, including public charter schools. Beginning in 2023, this needs survey shall include progress |
21 | towards and recommendations for energy efficiency and renewable energy upgrades to bring all |
22 | state school buildings to the definition of a zero energy capable school building pursuant to § 16- |
23 | 7-36; |
24 | (15) Developing a formal enrollment projection model or using projection models already |
25 | available; |
26 | (16) Encouraging local education agencies to investigate opportunities for the maximum |
27 | utilization of space in and around the district; |
28 | (17) Collecting and maintaining a clearinghouse of prototypical school plans that may be |
29 | consulted by eligible applicants; |
30 | (18) Retaining the services of consultants, as necessary, to effectuate the roles and |
31 | responsibilities listed within this section; |
32 | (19) Hiring an appropriate staff member who shall create and implement a plan to bring all |
33 | state school buildings in compliance with the definition of a zero energy capable school building |
34 | pursuant to § 16-7-36 and who shall provide technical advice and assistance, training, and education |
| LC001149 - Page 9 of 11 |
1 | to cities, towns, and/or local education agencies, and to general contractors, subcontractors, |
2 | construction or project managers, designers and others on the latest NE-CHPS standards; |
3 | (19)(20) No district shall receive a combined total of more than twenty (20) incentive |
4 | percentage points for projects that commence construction by December 30, 2023, and five (5) |
5 | incentive points for projects that commence construction thereafter; provided further, these caps |
6 | shall be in addition to amounts received under §§ 16-7-40(a)(1), and 16-7-40(a)(2), 16-7-40(j)(1), |
7 | and 16-7-40(j)(2). Furthermore, a district’s share shall not be decreased by more than half of its |
8 | regular share irrespective of the number of incentive points received, nor shall a district’s state |
9 | share increase by more than half of its regular share, including amounts received under §§ 16-7- |
10 | 40(a)(1) and 16-7-40(a)(2), irrespective of the number of incentive points received. |
11 | Notwithstanding any provision of the general laws to the contrary, the reimbursement or aid |
12 | received under this chapter or chapter 38.2 of title 45 shall not exceed one hundred percent (100%) |
13 | of the sum of the total project costs plus interest costs. If a two hundred and fifty million dollar |
14 | ($250,000,000) general obligation bond is approved on the November 2018 ballot, projects |
15 | approved between May 1, 2015, and January 1, 2018, are eligible to receive incentive points (above |
16 | and beyond what the project was awarded at the time of approval) pursuant to § 16-7-39 and § 16- |
17 | 7-40. Provided, however, any project approved during this time period with a project cost in excess |
18 | of one million five hundred thousand dollars ($1,500,000), which does not include an owner’s |
19 | program manager and a commissioning agent, shall only be eligible to receive five (5) incentive |
20 | points. Incentive points awarded pursuant to the provisions of this subsection shall only be applied |
21 | to reimbursements occurring on or after July 1, 2018. Any project approved between May 1, 2015, |
22 | and January 1, 2018, that is withdrawn and/or resubmitted for approval shall not be eligible for any |
23 | incentive points. |
24 | SECTION 4. This act shall take effect upon passage. |
======== | |
LC001149 | |
======== | |
| LC001149 - Page 10 of 11 |
EXPLANATION | |
BY THE LEGISLATIVE COUNCIL | |
OF | |
A N A C T | |
RELATING TO EDUCATION -- SCHOOL FUNDS AND PROPERTY | |
*** | |
1 | This act would provide that not later than December 31, 2023, the department of education |
2 | would develop and adopt, in consultation with the office of energy resources, regulations requiring |
3 | all school buildings to meet the standard of zero energy capable, as defined in § 16-7-36, by |
4 | December 31, 2035. |
5 | This act would take effect upon passage. |
======== | |