Chapter 301
2023 -- S 0684 SUBSTITUTE A
Enacted 06/24/2023

A N   A C T
RELATING TO PUBLIC UTILITIES AND CARRIERS -- NET METERING

Introduced By: Senators DiMario, Euer, Britto, Miller, Lawson, Ruggerio, and Kallman

Date Introduced: March 17, 2023

It is enacted by the General Assembly as follows:
     SECTION 1. Sections 39-26.4-1, 39-26.4-2 and 39-26.4-3 of the General Laws in Chapter
39-26.4 entitled "Net Metering" are hereby amended to read as follows:
     39-26.4-1. Purpose.
     The purpose of this chapter is to facilitate and promote installation of customer-sited, grid-
connected generation of renewable energy; to support and encourage customer development of
renewable generation systems; to reduce environmental and siting impacts; to reduce carbon
emissions that contribute to climate change by encouraging the local siting of renewable energy
projects; to diversify the state’s energy generation sources; to stimulate economic development; to
improve distribution system resilience and reliability; and to reduce distribution system costs.
     39-26.4-2. Definitions.
     Terms not defined in this section herein shall have the same meaning as contained in
chapter 26 of this title. When used in this chapter:
     (1) “Community remote net-metering system” means a facility generating electricity using
an eligible net-metering resource that allocates net-metering credits to a minimum of one account
for a system associated with low- or moderate-income housing eligible credit recipients, or three
(3) eligible credit-recipient customer accounts, provided that no more than fifty percent (50%) of
the credits produced by the system are allocated to one eligible credit recipient, and provided further
at least fifty percent (50%) of the credits produced by the system are allocated to the remaining
eligible credit recipients in an amount not to exceed that which is produced annually by twenty-
five kilowatt (25 KW) AC capacity. The community remote net-metering system may transfer
credits to eligible credit recipients in an amount that is equal to or less than the sum of the usage of
the eligible credit recipient accounts measured by the three-year (3) average annual consumption
of energy over the previous three (3) years. A projected annual consumption of energy may be used
until the actual three-year (3) average annual consumption of energy over the previous three (3)
years at the eligible credit recipient accounts becomes available for use in determining eligibility
of the generating system. The community remote net-metering system may be owned by the same
entity that is the customer of record on the net-metered account or may be owned by a third party.
(2) “Core forest” refers to unfragmented forest blocks of single or multiple parcels totaling two
hundred fifty (250) acres or greater unbroken by development and at least twenty-five (25) yards
from mapped roads, with eligibility questions to be resolved by the director of the department of
environmental management. Such determination shall constitute a contested case as defined in §
42-35-1(5).
     (2)(3) “Electric distribution company” shall have the same meaning as § 39-1-2, but shall
not include Block Island Power Company or Pascoag Utility District, each of whom shall be
required to offer net metering to customers through a tariff approved by the public utilities
commission after a public hearing. Any tariff or policy on file with the public utilities commission
on the date of passage of this chapter shall remain in effect until the commission approves a new
tariff.
     (3)(4) “Eligible credit recipient” means one of the following eligible recipients in the
electric distribution company’s service territory whose electric service account or accounts may
receive net-metering credits from a community remote net-metering system. Eligible credit
recipients include the following definitions:
     (i) Residential accounts in good standing.
     (ii) “Low- or moderate-income housing eligible credit recipient” means an electric service
account or accounts in good standing associated with any housing development or developments
owned or operated by a public agency, nonprofit organization, limited-equity housing cooperative,
or private developer that receives assistance under any federal, state, or municipal government
program to assist the construction or rehabilitation of housing affordable to low- or moderate-
income households, as defined in the applicable federal or state statute, or local ordinance,
encumbered by a deed restriction or other covenant recorded in the land records of the municipality
in which the housing is located, that:
     (A) Restricts occupancy of no less than fifty percent (50%) of the housing to households
with a gross, annual income that does not exceed eighty percent (80%) of the area median income
as defined annually by the United States Department of Housing and Urban Development (HUD);
     (B) Restricts the monthly rent, including a utility allowance, that may be charged to
residents, to an amount that does not exceed thirty percent (30%) of the gross, monthly income of
a household earning eighty percent (80%) of the area median income as defined annually by HUD;
     (C) Has an original term of not less than thirty (30) years from initial occupancy.
     Electric service account or accounts in good standing associated with housing
developments that are under common ownership or control may be considered a single low- or
moderate-income housing eligible credit recipient for purposes of this section. The value of the
credits shall be used to provide benefits to tenants.
     (iii) “Educational institutions” means public and private schools at the primary, secondary,
and postsecondary levels.
     (iv) “Commercial or industrial customers” means any non-residential nonresidential
customer of the electric distribution company.
     (4)(5) “Eligible net-metering resource” means eligible renewable energy resource, as
defined in § 39-26-5 including biogas created as a result of anaerobic digestion, but, specifically
excluding all other listed eligible biomass fuels.
     (5)(6) “Eligible net-metering system” means a facility generating electricity using an
eligible net-metering resource that is reasonably designed and sized to annually produce electricity
in an amount that is equal to, or less than, the renewable self-generator’s usage at the eligible net-
metering system site measured by the three-year (3) average annual consumption of energy over
the previous three (3) years at the electric distribution account(s) located at the eligible net-metering
system site. A projected annual consumption of energy may be used until the actual three-year (3)
average annual consumption of energy over the previous three (3) years at the electric distribution
account(s) located at the eligible net-metering system site becomes available for use in determining
eligibility of the generating system. The eligible net-metering system may be owned by the same
entity that is the customer of record on the net-metered accounts or may be owned by a third party
that is not the customer of record at the eligible net-metering system site and which may offer a
third-party, net-metering financing arrangement or net-metering financing arrangement, as
applicable. Notwithstanding any other provisions of this chapter, any eligible net-metering
resource: (i) Owned by a public entity, educational institution, hospital, nonprofit, or multi-
municipal collaborative; or (ii) Owned and operated by a renewable-generation developer on behalf
of a public entity, educational institution, hospital, nonprofit, or multi-municipal collaborative
through a net-metering financing arrangement shall be treated as an eligible net-metering system
and all accounts designated by the public entity, educational institution, hospital, nonprofit, or
multi-municipal collaborative for net metering shall be treated as accounts eligible for net metering
within an eligible net-metering system site,; or (iii) Owned and operated by a renewable-generation
developer on behalf of one or more commercial or industrial customer(s) through net-metering
financing arrangement(s) shall be treated as an eligible net-metering system within an eligible net-
metering system site. Notwithstanding any other provision to the contrary, effective July 1, 2060,
an eligible net-metering system means a facility generating electricity using an eligible net-
metering resource that is interconnected behind the same meter as the net-metering customer’s load.
     (6)(7) “Eligible net-metering system site” means the site where the eligible net-metering
system or community remote net-metering system is located or is part of the same campus or
complex of sites contiguous to one another and the site where the eligible net-metering system or
community remote net-metering system is located or a farm in on which the eligible net-metering
system or community remote net-metering system is located. Except for an eligible net-metering
system owned by or operated on behalf of a public entity, educational institution, hospital,
nonprofit, or multi-municipal collaborative through a net-metering financing arrangement or for a
commercial or industrial customer through a net-metering financing arrangement, the purpose of
this definition is to reasonably assure that energy generated by the eligible net-metering system is
consumed by net-metered electric service account(s) that are actually located in the same
geographical location as the eligible net-metering system. All energy generated from any eligible
net-metering system is, and will be considered, consumed at the meter where the renewable energy
resource is interconnected for valuation purposes. Except for an eligible net-metering system
owned by, or operated on behalf of, a public entity, educational institution, hospital, nonprofit, or
multi-municipal collaborative, or for a commercial or industrial customer through a net-metering
financing arrangement, or except for a community remote net-metering system, all of the net-
metered accounts at the eligible net-metering system site must be the accounts of the same customer
of record and customers are not permitted to enter into agreements or arrangements to change the
name on accounts for the purpose of artificially expanding the eligible net-metering system site to
contiguous sites in an attempt to avoid this restriction. However, a property owner may change the
nature of the metered service at the accounts at the site to be master metered in the owner’s name,
or become the customer of record for each of the accounts, provided that the owner becoming the
customer of record actually owns the property at which the account is located. As long as the net-
metered accounts meet the requirements set forth in this definition, there is no limit on the number
of accounts that may be net metered within the eligible net-metering system site.
     (7)(8) “Excess renewable net-metering credit” means a credit that applies to an eligible net-
metering system or community remote net-metering system for that portion of the production of
electrical energy beyond one hundred percent (100%) and no greater than one hundred twenty-five
percent (125%) of the renewable self-generator’s own consumption at the eligible net-metering
system site or the sum of the usage of the eligible credit recipient accounts associated with the
community remote net-metering system during the applicable billing period. Such excess
renewable net-metering credit shall be equal to the electric distribution company’s avoided cost
rate, which is hereby declared to be the electric distribution company’s standard-offer last resort
service kilowatt hour (KWh) charge for the rate class and time-of-use billing period (if applicable)
applicable to the customer of record for the eligible net-metering system or applicable to the
customer of record for the community remote net-metering system. The commission shall have the
authority to make determinations as to the applicability of this credit to specific generation facilities
to the extent there is any uncertainty or disagreement.
     (8)(9) “Farm” shall be defined in accordance with § 44-27-2, except that all buildings
associated with the farm shall be eligible for net-metering credits as long as: (i) The buildings are
owned by the same entity operating the farm or persons associated with operating the farm; and (ii)
The buildings are on the same farmland as the project on either a tract of land contiguous with, or
reasonably proximate to, such farmland or across a public way from such farmland.
     (9)(10) “Hospital” means and shall be defined and established as set forth in chapter 17 of
title 23.
     (10)(11) “Multi-municipal collaborative” means a group of towns and/or cities that enter
into an agreement for the purpose of co-owning a renewable-generation facility or entering into a
financing arrangement pursuant to subsection (14) (15).
     (11)(12) “Municipality” means any Rhode Island town or city, including any agency or
instrumentality thereof, with the powers set forth in title 45.
     (12)(13) “Net metering” means using electrical energy generated by an eligible net-
metering system for the purpose of self-supplying electrical energy and power at the eligible net-
metering system site, or with respect to a community remote net-metering system, for the purpose
of generating net-metering credits to be applied to the electric bills of the eligible credit recipients
associated with the community net-metering system. The amount so generated will thereby offset
consumption at the eligible net-metering system site through the netting process established in this
chapter, or with respect to a community remote net-metering system, the amounts generated in
excess of that amount will result in credits being applied to the eligible credit-recipient accounts
associated with the community remote net-metering system.
     (13)(14) “Net-metering customer” means a customer of the electric distribution company
receiving and being billed for distribution service whose distribution account(s) are being net
metered.
     (14)(15) “Net-metering financing arrangement” means arrangements entered into by a
public entity, educational institution, hospital, nonprofit, or multi-municipal collaborative, or a
commercial or industrial customer with a private entity to facilitate the financing and operation of
a net-metering resource, in which the private entity owns and operates an eligible net-metering
resource on behalf of a public entity, educational institution, hospital, nonprofit, or multi-municipal
collaborative, or commercial or industrial customer, where: (i) The eligible net-metering resource
is located on property owned or controlled by the public entity, educational institution, hospital, or
one of the municipalities, municipality, multi-municipal collaborative, or commercial or industrial
customer as applicable; and (ii) The production from the eligible net-metering resource and primary
compensation paid by the public entity, educational institution, hospital, nonprofit, or multi-
municipal collaborative, or commercial or industrial customer to the private entity for such
production is directly tied to the consumption of electricity occurring at the designated net-metered
accounts.
     (15)(16) “Nonprofit” means a nonprofit corporation as defined and established through
chapter 6 of title 7, and shall include religious organizations that are tax exempt pursuant to 26
U.S.C. § 501(d).
     (16)(17) “Person” means an individual, firm, corporation, association, partnership, farm,
town or city of the state of Rhode Island, multi-municipal collaborative, or the state of Rhode Island
or any department of the state government, governmental agency, or public instrumentality of the
state.
     (18) “Preferred site” means a location for a renewable energy system that has had prior
development, including, but not limited to,: landfills, gravel pits and quarries, highway and major
road median strips, brownfields, superfund sites, parking lots or sites that are designated
appropriate for carports, and all rooftops including, but not limited to, residential, commercial,
industrial, and municipal buildings.
     (17)(19) “Project” means a distinct installation of an eligible net-metering system or a
community remote net-metering system. An installation will be considered distinct if it is installed
in a different location, or at a different time, or involves a different type of renewable energy.
Subject to the safe-harbor provisions in § 39-26.4-3(a)(1), new and distinct projects cannot be
located on adjoining parcels of land within core forests, except for preferred sites.
     (18)(20) “Public entity” means the federal government, the state of Rhode Island,
municipalities, wastewater treatment facilities, public transit agencies, or any water distributing
plant or system employed for the distribution of water to the consuming public within this state
including the water supply board of the city of Providence.
     (21) "Public entity net-metering system" means a system generating renewable energy at a
property owned or controlled by the public entity which that is participating in a net-metering
financing arrangement where the public entity has designated accounts in its name to receive net-
metering credits.
     (19)(22) “Renewable net-metering credit” means a credit that applies to an eligible net-
metering system or a community remote net-metering system up to one hundred percent (100%) of
either the renewable self-generator’s usage at the eligible net-metering system site or the sum of
the usage of the eligible credit-recipient accounts associated with the community remote net-
metering system over the applicable billing period. This credit shall be equal to the total kilowatt
hours of electrical energy generated up to the amount consumed on-site, and/or generated up to the
sum of the eligible credit-recipient account usage during the billing period multiplied by the sum
of the distribution company’s:
     (i) Standard-offer Last resort service kilowatt-hour charge for the rate class applicable to
the net-metering customer, except that for remote public entity and multi-municipality
collaborative net-metering systems that submit an application for an interconnection study on or
after July 1, 2017, and community remote net-metering systems, the standard-offer last resort
service kilowatt-hour charge shall be net of the renewable energy standard charge or credit;
     (ii) Distribution kilowatt-hour charge;
     (iii) Transmission kilowatt-hour charge; and
     (iv) Transition kilowatt-hour charge.
     For projects after April 15, 2023, subject to the allowable two hundred seventy-five
megawatts alternating current (275MWac), under § 39-26.4-3(a)(1)(vi), the credit shall be reduced
by twenty percent (20%).
     Notwithstanding the foregoing, except for systems that have requested an interconnection
study for which payment has been received by the distribution company, or if an interconnection
study is not required, a completed and paid interconnection application, by December 31, 2018, the
renewable net-metering credit for all remote public entity and multi-municipal collaborative net-
metering systems shall not include the distribution kilowatt-hour charge commencing on January
1, 2050.
     (20)(23) “Renewable self-generator” means an electric distribution service customer of
record for the eligible net-metering system or community remote net-metering system at the eligible
net-metering system site which system is primarily designed to produce electrical energy for
consumption by that same customer at its distribution service account(s), and/or, with respect to
community remote net-metering systems, electrical energy which generates net-metering credits to
be applied to offset the eligible credit-recipient account usage.
     (21)(24) “Third party” means and includes any person or entity, other than the renewable
self-generator, who or that owns or operates the eligible net-metering system or community remote
net-metering system on the eligible net-metering system site for the benefit of the renewable self-
generator.
     (22)(25) “Third-party, net-metering financing arrangement” means the financing of
eligible net-metering systems or community remote net-metering systems through lease
arrangements or power/credit purchase agreements between a third party and renewable self-
generator, except for those entities under a public entity net-metering financing arrangement. A
third party engaged in providing financing arrangements related to such net-metering systems with
a public or private entity is not a public utility as defined in § 39-1-2.
     39-26.4-3. Net metering.
     (a) The following policies regarding net metering of electricity from eligible net-metering
systems and community remote net-metering systems and regarding any person that is a renewable
self-generator shall apply:
     (1)(i) The maximum allowable capacity for eligible net-metering systems, based on
nameplate capacity, shall be ten megawatts (10 MW), effective sixty (60) days after passage.
     (ii) Eligible net-metering systems shall be sited outside of core forests with the exception
of development on preferred sites in the core forest and the exception of systems that, as of April
15, 2023, (iA) have Have submitted a complete application to the appropriate municipality for any
required permits and/or zoning changes, or, (iiB) have Have requested an interconnection study for
which payment has been received by the distribution company, or (iiiC) if If an interconnection
study is not required, systems that have a completed and paid interconnection application.
     (iii) For systems developed in core forests on preferred sites, no more than one hundred
thousand square feet (100,000 sq. ft) of core forest shall be removed, including for work required
for utility interconnection or development of a brownfield, in which case no more core forest than
necessary for interconnection or brownfield development shall be removed.
     (iv) The aggregate amount of net metering in the Block Island Utility District doing
business as Block Island Power Company and the Pascoag Utility District shall not exceed a
maximum percentage of peak load for each utility district as set by the utility district based on its
operational characteristics, subject to commission approval; and .
     (ii)(v) Through December 31, 2018, the maximum aggregate amount of community remote
net-metering systems built shall be thirty megawatts (30 MW). Any of the unused MW amount
after December 31, 2018, shall remain available to community remote net-metering systems until
the MW aggregate amount is interconnected. After December 31, 2018, the commission may
expand or modify the aggregate amount after a public hearing upon petition by the office of energy
resources. The commission shall determine within six (6) months of such petition being docketed
by the commission whether the benefits of the proposed expansion exceed the cost. This aggregate
amount shall not apply to any net-metering financing arrangement involving public entity facilities,
multi-municipal collaborative facilities, educational institutions, the federal government, hospitals,
or nonprofits. By June 30, 2018, the commission shall conduct a study examining the cost and
benefit to all customers of the inclusion of the distribution charge as a part of the net-metering
calculation.
     (vi) The maximum aggregate capacity of remote net metering allowable for ground-
mounted eligible net- metering systems, as defined by § 39-26.4-2(6), with the exception of systems
that have, as of April 15, 2023, submitted a complete application to the appropriate municipality
for any required permits and/or zoning changes or have requested an interconnection study for
which payment has been received by the distribution company, or if an interconnection study is not
required, a completed and paid interconnection application by the distribution company date of
passage, shall be two hundred seventy-five megawatts, alternating current (275 MWACac),
excluding off- shore wind. None of the systems to which this cap applies shall be in core forests
unless on a preferred site located within the core forest. A project counts against this maximum if
it is in operation or under construction by July 1, 2030, as determined by the local distribution
company. All eligible ground-mounted net-metering systems must be under construction or in
operation by July 1, 2030. This restriction shall not apply to the following: (1A) the The eligible
net-metering system is interconnected behind the same meter as the net-metering customer’s load;
and/or (2B) the The energy generated by the eligible net-metering system is consumed by net-
metered electric service account(s) of the same owner of record that are actually located on the
same or contiguous parcels as the eligible net-metering system.
     (2) For ease of administering net-metered accounts and stabilizing net-metered account
bills, the electric distribution company may elect (but is not required) to estimate for any twelve-
month (12) period:
     (i) The production from the eligible net-metering system or community remote net-
metering system; and
     (ii) Aggregate consumption of the net-metered accounts at the eligible net-metering system
site or the sum of the consumption of the eligible credit-recipient accounts associated with the
community remote net-metering system, and establish a monthly billing plan that reflects the
expected credits that would be applied to the net-metered accounts over twelve (12) months. The
billing plan would be designed to even out monthly billings over twelve (12) months, regardless of
actual production and usage. If such election is made by the electric distribution company, the
electric distribution company would reconcile payments and credits under the billing plan to actual
production and consumption at the end of the twelve-month (12) period and apply any credits or
charges to the net-metered accounts for any positive or negative difference, as applicable. Should
there be a material change in circumstances at the eligible net-metering system site or associated
accounts during the twelve-month (12) period, the estimates and credits may be adjusted by the
electric distribution company during the reconciliation period. The electric distribution company
also may elect (but is not required) to issue checks to any net-metering customer in lieu of billing
credits or carry-forward credits or charges to the next billing period. For residential-eligible net-
metering systems and community remote net-metering systems twenty-five kilowatts (25 KW) or
smaller, the electric distribution company, at its option, may administer renewable net-metering
credits month to month allowing unused credits to carry forward into the following billing period.
     (3) If the electricity generated by an eligible net-metering system or community remote
net-metering system during a billing period is equal to, or less than, the net-metering customer’s
usage at the eligible net-metering system site or the sum of the usage of the eligible credit-recipient
accounts associated with the community remote net-metering system during the billing period, the
customer shall receive renewable net-metering credits, that shall be applied to offset the net-
metering customer’s usage on accounts at the eligible net-metering system site, or shall be used to
credit the eligible credit-recipient’s electric account.
     (4) If the electricity generated by an eligible net-metering system or community remote
net-metering system during a billing period is greater than the net-metering customer’s usage on
accounts at the eligible net-metering system site or the sum of the usage of the eligible credit-
recipient accounts associated with the community remote net-metering system during the billing
period, the customer shall be paid by excess renewable net-metering credits for the excess
electricity generated up to an additional twenty-five percent (25%) beyond the net-metering
customer’s usage at the eligible net-metering system site, or the sum of the usage of the eligible
credit-recipient accounts associated with the community remote net-metering system during the
billing period; unless the electric distribution company and net-metering customer have agreed to
a billing plan pursuant to subsection (a)(2).
     (5) The rates applicable to any net-metered account shall be the same as those that apply
to the rate classification that would be applicable to such account in the absence of net metering,
including customer and demand charges, and no other charges may be imposed to offset net-
metering credits.
     (b) The commission shall exempt electric distribution company customer accounts
associated with an eligible net-metering system from back-up or standby rates commensurate with
the size of the eligible net-metering system, provided that any revenue shortfall caused by any such
exemption shall be fully recovered by the electric distribution company through rates.
     (c) Any prudent and reasonable costs incurred by the electric distribution company
pursuant to achieving compliance with subsection (a) and the annual amount of any renewable net-
metering credits or excess renewable net-metering credits provided to accounts associated with
eligible net-metering systems or community remote net-metering systems, shall be aggregated by
the distribution company and billed to all distribution customers on an annual basis through a
uniform, per-kilowatt-hour (KWh) surcharge embedded in the distribution component of the rates
reflected on customer bills.
     (d) The billing process set out in this section shall be applicable to electric distribution
companies thirty (30) days after the enactment of this chapter.
     (e) The Rhode Island office of energy resources shall redesign the community solar remote
net metering program to reflect the provisions of this chapter and to include a commercial or
industrial anchor tenant up to but not to exceed fifty percent (50%) of the project. The remaining
fifty percent (50%) must be allocated or subscribed to low- and moderate-income (LMI) residents
and/or those living in areas defined as disadvantaged and environmental justice communities. The
Rhode Island office of energy resources shall design the net metering credit rate and factor in
federal energy funding and tax credits to develop the most cost-effective rate for community solar
projects. It is expected that these projects will be operational for a twenty-(20)year (20) period. The
Rhode Island office of energy resources shall file a benefit and cost analysis with any program
proposal filed to the Rhode Island public utilities commission. Once the Rhode Island office of
energy resources files a program proposal to the Rhode Island public utilities commission, a docket
shall be established, and the Rhode Island public utilities commission shall issue a ruling on the
program no later than one-hundred and fifty (150) days. If a program is approved, it will be subject
to no greater than twenty megawatts (20 MW) per year for two years until the forty megawatts (40
MW) cap is met. Eligible net-metering systems shall be sited outside of core forests with the
exception of development on preferred sites in the core forest.
     SECTION 2. Sections 39-26.6-1, 39-26.6-3, 39-26.6-5, 39-26.6-7, 39-26.6-10, and 39-
26.6-12, 39-26.6-15, 39-26.6-22 and 39-26.6-25 of the General Laws in Chapter 39-26.6 entitled
"The Renewable Energy Growth Program" are hereby amended to read as follows:
     39-26.6-1. Purpose.
     The purpose of this chapter is to facilitate and promote installation of grid-connected
generation of renewable energy; support and encourage development of distributed renewable
energy generation systems; reduce environmental impacts; reduce carbon emissions that contribute
to climate change by encouraging the siting of renewable energy projects in the load zone of the
electric distribution company; diversify the energy-generation sources within the load zone of the
electric distribution company; stimulate economic development; improve distribution-system
resilience and reliability within the load zone of the electric distribution company; and reduce
distribution system costs enable the state to meet its climate and resilience goals, including those
established in the act on climate. This includes the goals to facilitate and promote installation of
grid-connected generation of renewable energy; support and encourage development of distributed
renewable energy generation systems while protecting important core forest areas essential to
climate resilience and complying with Rhode Island’s climate change mandates; reduce
environmental impacts; reduce carbon emissions that contribute to climate change by encouraging
the siting of renewable energy projects in the load zone of the electric distribution company and in
preferred areas that have already been disturbed by industry or other uses; diversify the energy-
generation sources within the load zone of the electric distribution company; stimulate economic
development; and improve distribution-system resilience and reliability with the load zone of the
electric distribution company.
     39-26.6-3. Definitions.
     When used in this chapter, the following terms shall have the following meanings:
     (1) “Board” shall mean the distributed-generation board as established pursuant to the
provisions of § 39-26.2-10 under the title distributed generation standard contract board, but shall
also fulfill the responsibilities set forth in this chapter.
     (2) “Ceiling price” means the bidding price cap(s) applicable to an each annual enrollment
for a given distributed-generation class, that shall be approved annually for each renewable energy
class pursuant to the procedure established in this chapter. the The ceiling price(s) are not required
to, but may be, approved for up to three years. The ceiling price for each technology should be a
price that would allow a private owner to invest in a given project at a reasonable rate of return,
based on recently reported and forecast information on the cost of capital and the cost of generation
equipment. The calculation of the reasonable rate of return for a project shall include, where
applicable, any state or federal incentives, including, but not limited to, tax incentives. Nothing
shall prohibit the distributed-generation board from proposing revised ceiling prices prior to a
program year to account for changes to available federal or state tax incentives, trade tariffs, or
other federal or state incentives which that would affect the calculation of the rate of return on a
project.
     (3) “Commercial-scale solar project” means a solar distributed-generation project with the
nameplate capacity specified in § 39-26.6-7.
     (4) “Commission” means the Rhode Island public utilities commission.
     (5) “Community remote distributed-generation system” means a distributed-generation
facility greater than two hundred fifty kilowatt (250 KW) nameplate direct current that allocates
bill credits for each kilowatt hour (KWh) generated to a minimum of three (3), eligible recipient-
customer accounts, provided that no more than fifty percent (50%) of the credits produced by the
system are allocated to one eligible recipient-customer account, and provided further that at least
fifty percent (50%) of the credits produced by the system are allocated to eligible recipients in an
amount not to exceed that which is produced annually by twenty-five kilowatt (25 KW) AC
capacity. The community remote distributed-generation system may transfer credits to eligible
recipient-customer accounts in an amount that is equal to, or less than, the sum of the usage of the
eligible recipient-customer accounts measured by the three-year-average (3) annual consumption
of energy over the previous three (3) years. A projected, annual consumption of energy may be
used until the actual three-year-average (3) annual consumption of energy over the previous three
(3) years at the eligible recipient-customer accounts becomes available for use in determining
eligibility of the generating system. The community remote distributed-generation system may be
owned by the same entity that is the customer of record on the net-metered account or may be
owned by a third party.
     (6) “Core forest” refers to unfragmented forest blocks of single or multiple parcels totaling
two hundred fifty (250) acres or greater unbroken by development and at least twenty-five (25)
acres from mapped roads, with eligibility questions to be resolved by the director of the department
of environmental management. Such determination shall constitute a contested case as defined in
§ 42-35-1. Notwithstanding any other provisions of this chapter, no renewable-distributed-
generation project that is located or planned to be located in or on a core forest, shall be considered
an eligible renewable-distributed-generation project or otherwise be eligible to participate in this
program, unless it is on a preferred site.
     (6)(7) “Distributed-generation facility” means an electrical-generation facility located in
the electric distribution company’s load zone with a nameplate capacity no greater than five
megawatts (5 MW), except for solar projects as described in § 39-26.6-7 that may exceed five
megawatts (5 MW) but shall not be greater than fifteen megawatts (15 MW), unless located on
preferred sites, in which case they may be sized up to thirty-nine megawatts (39 MW), using eligible
renewable energy resources as defined by § 39-26-5, including biogas created as a result of
anaerobic digestion, but, specifically excluding all other listed eligible biomass fuels, and
connected to an electrical power system owned, controlled, or operated by the electric distribution
company. For facilities developed in core forests on preferred sites, no more than one hundred
thousand square feet (100,000 sq. ft.) of core forest shall be removed, including for work required
for utility interconnection or development of a brownfield, in which case no more core forest than
necessary for interconnection or brownfield development shall be removed. For purposes of this
chapter, a distributed-generation facility must be a new resource that:
     (i) Has not begun operation;
     (ii) Is not under construction, but excluding preparatory site work that is less than twenty-
five percent (25%) of the estimated total project cost; and
     (iii) Except for small-scale solar projects, does not have in place investment or lending
agreements necessary to finance the construction of the facility prior to the submittal of an
application or bid for which the payment of performance-based incentives is sought under this
chapter except to the extent that such financing agreements are conditioned upon the project owner
being awarded performance-based incentives under the provisions of this chapter. For purposes of
this definition, preexisting hydro generation shall be exempt from the provisions of subsection
(67)(i) regarding operation, if the hydro-generation facility will need a material investment to
restore or maintain reliable and efficient operation and meet all regulatory, environmental, or
operational requirements. For purposes of this provision, “material investment” shall mean
investment necessary to allow the project to qualify as a new, renewable energy resource under §
39-26-2. To be eligible for this exemption, the hydro-project developer at the time of submitting a
bid in the applicable procurement must provide reasonable evidence with its bid application
showing the level of investment needed, along with any other facts that support a finding that the
investment is material, the determination of which shall be a part of the bid review process set forth
in § 39-26.6-16 for the award of bids.
     (7)(8) “Distributed-generation project” means a distinct installation of a distributed-
generation facility. An installation will be considered distinct if it does not violate the segmentation
prohibition set forth in § 39-26.6-9.
     (8)(9) “Electric distribution company” means a company defined in § 39-1-2(a)(12),
supplying standard-offer service, last-resort service, or any successor service to end-use customers,
but not including the Block Island Power Company or the Pascoag Utility District.
     (9)(10) “ISO-NE” means Independent System Operator-New England, the Regional
Transmission Organization for New England designated by the Federal Energy Regulatory
Commission.
     (10)(11) “Large distributed-generation project” means a distributed-generation project that
has a nameplate capacity that exceeds the size of a small distributed-generation project in a given
year, but is no greater than five megawatts (5 MW) nameplate capacity.
     (11)(12) “Large-scale solar project” means a solar distributed-generation project with the
nameplate capacity specified in § 39-26.6-7.
     (12)(13) “Medium-scale solar project” means a solar distributed-generation project with
the nameplate capacity specified in § 39-26.6-7.
     (13)(14) “Office” means the Rhode Island office of energy resources.
     (15) “Preferred sites” means a location for a renewable energy system that has had prior
development, including, but not limited to, landfills, gravel pits and quarries, highway and major
road median strips, brownfields, superfund sites, parking lots or sites that are designated
appropriate for carports, and all rooftops including, but not limited to, residential, commercial,
industrial and municipal buildings.
     (14)(16) “Program year” means a year beginning April 1 and ending March 31, except for
the first program year, that may commence after April 1, 2015, subject to commission approval.
     (15)(17) “Renewable energy certificate” means a New England Generation Information
System renewable energy certificate as defined in § 39-26-2(14).
     (16)(18) “Renewable energy classes” means categories for different renewable energy
technologies using eligible renewable energy resources as defined by § 39-26-5, including biogas
created as a result of anaerobic digestion, but, specifically excluding all other listed eligible biomass
fuels specified in § 39-26-2(6). For each program year, in addition to the classes of solar distributed
generation specified in § 39-26.6-7, the board shall determine the renewable energy classes as are
reasonably feasible for use in meeting distributed-generation objectives from renewable energy
resources and are consistent with the goal of meeting the annual target for the program year. The
board may make recommendations to the commission to add, eliminate, or adjust renewable energy
classes for each program year, provided that the solar classifications set forth in § 39-26.6-7 shall
remain in effect for at least the first two (2) program years and no distributed-generation project
may exceed five megawatts (5 MW) of nameplate capacity except for solar projects as described
in § 39-26.6-7.
     (17)(19) “Shared solar facility” means a single small-scale or medium-scale solar facility
that must allocate bill credits to at least two (2), and no more than fifty (50), accounts in the same
customer class and on the same or adjacent parcels of land. Public entities may allocate such bill
credits to at least two (2), and up to fifty (50), accounts without regard to physical location so long
as the facility and accounts are within the same municipality. In no case will the annual allocated
credits in KWh exceed the prior three-year (3) annual average usage, less any reductions for verified
energy-efficiency measures installed at the customer premises, of the customer account to which
the bill credits are transferred.
     (18)(20) “Small distributed-generation project” means a distributed-generation renewable
energy project that has a nameplate capacity within the following: Wind: fifty kilowatts (50 KW)
to one and one-half megawatts (1.5 MW); small-scale solar projects and medium-scale solar
projects with the capacity limits as specified in § 39-26.6-7. For technologies other than solar and
wind, the board shall set the nameplate capacity-size limits, but such limits may not exceed one
megawatt (1 MW).
     (19)(21) “Small-scale solar project” means a solar distributed-generation project with the
nameplate capacity specified in § 39-26.6-7.
     39-26.6-5. Tariffs proposed and approved.
     (a) Each year, for a period of at least five (5) program years, the electric distribution
company shall file tariffs with the commission that are designed to provide a multiyear stream of
performance-based incentives to eligible renewable-distributed-generation projects for a term of
years, under terms and conditions set forth in the tariffs and approved by the commission. The
tariffs shall set forth the rights and obligations of the owner of the distributed-generation project
and the conditions upon which payment of performance-based incentives by the electric
distribution company will be paid. The tariffs shall include the non-price conditions set forth in §§
39-26.2-7(2)(i) — (vii) for small distributed-generation projects (other than small- and medium-
scale solar) and large distributed-generation projects; provided, however, that the time periods for
the projects to reach ninety percent (90%) of output shall be extended to twenty-four (24) months
(other than eligible anaerobic-digestion projects, which shall be thirty-six (36) months, and eligible
small-scale hydro, and large-scale solar projects which shall be forty-eight (48) months). The non-
price conditions in the tariffs for small- and medium-scale solar shall take into account the different
circumstances for distributed-generation projects of the smaller sizes.
     (b) In addition to the tariff(s), the filing shall include the rules governing the solicitation
and enrollment process. The solicitation rules will be designed to ensure the orderly functioning of
the distributed-generation growth program and shall be consistent with the legislative purposes of
this chapter.
     (c) In proposing the tariff(s) and solicitation rules applicable to each year, the tariff(s) and
rules shall be developed by the electric distribution company and will be reviewed by the office
and the board before being sent to the commission for its approval. The proposed tariffs shall
include the ceiling prices and term lengths for each tariff that are recommended by the board. The
term lengths shall be from fifteen (15) to twenty (20) years; provided, however, that the board may
recommend shorter terms for small-scale solar projects. Whatever term lengths between fifteen
(15) and twenty (20) years are chosen for any given tariff, the evaluation of the bids for that tariff
shall be done on a consistent basis such that the same term lengths for competing bids are used to
determine the winning bids.
     (d) The board shall use the same standards for setting ceiling prices as set forth in § 39-
26.2-5. In setting the ceiling prices, the board may specifically consider:
     (1) Transactions for newly developed renewable energy resources, by technology and size,
in the ISO-NE control area and the northeast corridor;
     (2) Pricing from bids received during the previous program year;
     (3) Environmental benefits, including, but not limited to, reducing carbon emissions;
     (4) For community remote distributed-generation systems, administrative costs and
financial benefits for participating customers;
     (5) System benefits; and
     (6) Cost-effectiveness;
     (7) Location of projects, including climate resilience and conservation benefits; and
     (8) Labor standards pursuant to chapter 26.9 of this title 39.
     (e) At least forty-five (45) days before filing the tariff(s) and solicitation rules, the electric
distribution company shall provide the tariff(s) and rules in draft form to the board for review. The
commission shall have the authority to determine the final terms and conditions in the tariff and
rules. Once approved, the commission shall retain exclusive jurisdiction over the performance-
based incentive payments, terms, conditions, rights, enforcement, and implementation of the tariffs
and rules, subject to appeals pursuant to chapter 5 of this title.
     39-26.6-7. Solar project size categories.
     (a) Tariff(s) shall be proposed for each of the following solar distributed-generation
classes:
     (1) Small-scale solar projects;
     (2) Medium-scale solar projects;
     (3) Commercial-scale solar projects; and
     (4) Large-scale solar projects.
     (b) Such classes of solar distributed-generation projects shall be established based on
nameplate megawatt size as follows:
     (1) Large scale: solar projects from one megawatt (1 MW), up to and including, five
megawatts (5 MW) nameplate capacity; shall be comprised of four (4) classes as follows:
     (i) One megawatt (1 MW) but less than five megawatts (5 MW), nameplate capacity;
     (ii) Five megawatts (5 MW), but less than ten megawatts (10 MW), nameplate capacity;
     (iii) Ten megawatts (10 MW), but less than fifteen megawatts (15 MW), nameplate
capacity; and
     (iv) Fifteen megawatts (15 MW), but less than thirty-nine megawatts (39 MW), nameplate
capacity for projects located on preferred sites.;
     (2) Commercial scale: shall be comprised of solar projects greater than two hundred fifty
kilowatts (250 KW), but less than one megawatt (1 MW) nameplate capacity;
     (3) Medium scale: shall be comprised of solar projects greater than twenty-five kilowatts
(25 KW), up to and including, two hundred fifty kilowatts (250 KW) nameplate capacity; and
     (4) Small scale: shall be comprised of solar projects, up to and including, twenty-five
kilowatts (25 KW) nameplate capacity.
     (c) Other classifications of solar projects may also be proposed by the board, subject to the
approval of the commission. After the second program year, the board may make recommendations
to the commission to adjust the size categories of the solar classes, provided that the medium-scale
solar projects may not exceed two hundred fifty kilowatts (250 KW); and/or allocated capacity to
community distributed-generation facilities, allowing them to compete or enroll under a distinct
ceiling price.
     39-26.6-10. Timing and schedule of tariff filings.
     (a) The electric distribution company shall file with the commission the first set of tariffs
and solicitation rules pursuant to this chapter no later than November 15, 2014. Thereafter, the
electric distribution company shall make annual tariff and solicitation rules filings with the
commission no later than November 15 prior to the beginning of the applicable program year when
necessary, which tariffs and rules shall be applicable for the next program year(s).
     (b) Upon receiving the filing from the electric distribution company, the commission shall
open a docket to consider the filing. The commission shall issue an order approving the proposed
tariffs and solicitation rules; provided, however, that the commission may make any modifications
that it deems appropriate consistent with the legislative purposes of this chapter as set forth herein.
     (c) For the first program year, the commission shall issue its order approving tariff(s) and
solicitation rules by no later than March 31, 2015. Thereafter, the The commission shall approve
them by February 15 tariff(s) and solicitation rules prior to the commencement of each succeeding
the applicable year(s).
     (d) During the course of any program year, the electric distribution company may, at any
time, in consultation with the office and the board, propose tariff or solicitation rules modifications.
The commission shall consider the proposed modifications through an already open or new docket,
and shall issue its order within one hundred five (105) days of the filing of the proposed
modification. If approved, the proposed modification shall take effect for the next enrollment event
following the issuance of the commission’s order.
     39-26.6-12. Annual bidding and enrollments.
     (a) With the exception of the first program year (2015), the The electric distribution
company, in consultation with the board and office, shall conduct at least three (3) tariff enrollments
for each distributed-generation class each program year. For the first program year, the board may
recommend that either two (2) or three (3) enrollments be conducted.
     (b) During each program year, the tariff enrollments shall have both an annual targeted
amount of nameplate megawatts (“annual MW target”) and a nameplate megawatt target for each
separate enrollment event (“enrollment MW target”). The enrollment MW target shall comprise the
specific portion of the annual MW target sought to be obtained in that enrollment. The annual MW
target(s) and enrollment MW targets shall be recommended by the board each year no less
frequently than every three (3) years, subject to commission approval. The board shall also
recommend a megawatt target for each class (“class MW target”) that comprises a specified portion
of the enrollment MW target, subject to commission approval. If the electric distribution company,
the office, and the board mutually agree, they may reallocate megawatts during an enrollment from
one class to another without commission approval if there is an over-subscription in one class and
an under-subscription in another, provided that the annual MW target is not being exceeded, except
as provided in § 39-26.6-7 39-26.6-17. No reallocation of megawatts from a competitive pricing
class to a non-competitive pricing class shall be made until after the completion of the three (3)
enrollment periods in the program year and in no case may the annual MW target be exceeded as a
result of a reallocation of megawatts.
     (c) The annual MW targets shall be established from the year 2023 through the year 2033.
The annual target for each program year shall be up to three hundred megawatts (300 MW);
provided that, thirty megawatts (30 MW) shall be reserved for projects less than one megawatt (1
MW). The board may petition the commission for approval of multi-year annual targets and
associated-ceiling prices. established as follows; provided, however, that at least three megawatts
(3 MW) of nameplate capacity shall be carved out exclusively for small-scale solar projects in each
of the first four (4) program years:
     (1) For the first program year (2015), the annual MW target shall be twenty-five nameplate
megawatts (25 MW);
     (2) For the second program year, the annual targets shall be forty nameplate megawatts (40
MW);
     (3) For the third and fourth program years, the annual target shall be forty nameplate
megawatts (40 MW), subject to the conditions set forth in subsection (f) of this section having been
met for the applicable prior program year as determined in the manner specified in subsection (g)
of this section;
     (4) For the fifth program year, the annual target shall be set to obtain the balance of capacity
needed to achieve one hundred sixty nameplate megawatts (160 MW) within the five-year (5)
distributed-generation growth program, subject to subsection (e) of this section and the conditions
set forth in subsection (f) of this section having been met for the fourth program year as determined
in the manner specified in subsection (g) of this section; and
     (5) From the year 2020 through the year 2029, the annual target for each program year shall
be an additional forty nameplate megawatts (40 MW) above the annual target for the preceding the
program year.
     (d) During the fifth year of the distributed-generation growth program, the board may
recommend to the commission an extension of time in the event that additional time is required to
achieve the full one hundred sixty nameplate megawatt (160 MW) target of the program. The
commission shall approve the recommendation of the board; provided, however, that the
commission may make any modifications to the board’s recommendation that the commission
deems appropriate, consistent with the legislative purposes of this chapter as set forth herein.
     (e) To the extent there was a shortfall of capacity procured under chapter 26.2 of this title
from distributed-generation procurements in 2014, such shortfall amount may be added to the one
hundred sixty megawatt (160 MW) target for acquisition in the fifth program year under this
chapter. In no event shall the electric distribution company be required to exceed the aggregate
amount of one hundred sixty (160) nameplate capacity plus any such shortfall amount over the five
(5) years, but may do so voluntarily, in consultation with the board and subject to commission
approval.
     (f) The conditions specified in subsections (c)(3) and (c)(4) of this section are as follows:
(1) That it is reasonable to conclude that the bid prices submitted in the procurements for the large-
scale solar and commercial-scale solar classes were reasonably competitive in the immediately
preceding program year; (2) That it is reasonable to conclude that the annual MW target specified
for the next program year is reasonably achievable; and (3) That the electric distribution company
was able to, or with reasonably prudent efforts should have been able to, perform the studies and
system upgrades on a timely basis necessary to accommodate the number of applications associated
with the targets without materially adversely affecting other electric-distribution construction
projects needed to provide reliable and safe electric-distribution service. To the extent the board or
the commission concludes that any of these conditions have not been met for the applicable
program year, the board may recommend, and/or the commission may adopt, a new annual MW
target, based on the factors set forth in subsection (h) of this section.
     (g) Before the third, fourth, and fifth program years, each year the board shall review the
conditions specified in subsection (f) of this section and make a recommendation to the commission
for findings as to whether they have been met for the applicable year. The recommendation shall
be filed with the commission, with copies to the office and the electric distribution company, and
any person who has made a written request to the commission to be included in such notification,
such list which may be obtained from the commission clerk, and a notice of such filing shall be
posted by the commission on its website. If no party files an objection to the recommended findings
within ten (10) business days of the posting, the commission may accept them without hearings. If
an objection is filed with a reasonable explanation for its basis, the commission shall hold hearings
and make the factual determination of whether the conditions have been met.
     (h) In the event that the conditions in subsection (f) of this section have not been met for
any program year, then the board and the commission shall take into account the factors set forth
below in setting the annual MW target for the following year. In addition, for every program year
the board and the commission shall take into account these factors in setting the class MW targets,
and the enrollment MW targets for the following year: (1) That the new annual, class, and
enrollment levels reasonably assure that competition among projects for the applicable bidding
classifications remains robust and likely to yield reasonable and competitive program costs; (2)
That, assuming prudent management of the program, the electric distribution company should be
able to perform the studies and system upgrades on a timely basis necessary to accommodate the
number of applications associated with the targets without materially adversely affecting other
electric-distribution construction projects needed to provide reliable and safe electric-distribution
service; and (3) Any other reasonable factors that are consistent with the legislative purpose of this
chapter as set forth herein, including the program purpose to facilitate the development of
renewable distributed generation in the load zone of the electric distribution company at reasonable
cost.
     (i) The renewable energy growth program is intended to achieve at least an aggregate
amount of one hundred sixty nameplate megawatts (160 MW) over five (5) years, plus any shortfall
amount added in pursuant to subsection (e) of this section. However, after the second program year,
the board may, based on market data and other information available to it, including pricing
received during previous program years, recommend changes to the annual target for any program
year above or below the specified targets in subsection (c) of this section if the board concludes
that market conditions are likely to produce favorably low or unfavorably high target pricing during
the upcoming program year, provided that the recommendation may not result in the five-year (5),
one-hundred-sixty-megawatt-nameplate (160 MW) target, plus any shortfall added pursuant to
subsection (e) of this section, being exceeded. Any megawatt reduction in an annual target shall be
added to the target in the fifth year of the program (and any subsequent years if necessary) such
that the overall program target of one-hundred-sixty-megawatt-nameplate (160 MW) capacity, plus
any shortfall added pursuant to subsection (e) of this section, is achieved. In considering these
issues, the board and the commission may take into account the reasonableness of current pricing
and its impact on all electric distribution customers and the legislative purpose of this chapter as
set forth herein, including the program purpose to facilitate the development of renewable
distributed generation in the load zone of the electric distribution company at reasonable cost.
     (j) The provisions of § 39-26.1-4 shall apply to the annual value of performance-based
incentives (actual payments plus the value of net-metering credits, as applicable) provided by the
electric distribution company to all the distributed-generation projects under this chapter, subject
to the following conditions:
     (1) The targets set for the applicable program year for the applicable project classifications
were met or, if not met, such failure was due to factors beyond the reasonable control of the electric
distribution company;
     (2) The electric distribution company has processed applications for service and completed
interconnections in a timely and prudent manner for the projects under this chapter, taking into
account factors within the electric distribution company’s reasonable control. The commission is
authorized to establish more specific performance standards to implement the provisions of this
chapter; and
     (3) The incentive shall be one and three-quarters percent (1.75%) of the annual value of
performance-based incentives. The commission is authorized to establish more specific
performance standards to implement the provisions of this paragraph.
     39-26.6-15. Bidding and incentive award processes for solar DG projects.
     (a) Large-scale and commercial-scale solar projects and distributed-generation projects for
other eligible technologies shall bid a price-per-kilowatt-hour for the entire output of the facility
(net of any station service) that shall not exceed the applicable ceiling price. Small-scale and
medium-scale solar projects will submit an enrollment application to receive a standard
performance-based incentive for the period of years in the applicable tariff, that shall be a price-
per-kilowatt-hour for the entire output of the facility. Except for megawatts that may be allocated
to the energy-efficiency program pursuant to § 39-26.6-19, small- and medium-scale projects shall
be selected on a first-come, first-served basis, or by means of a commission-approved lottery
system, or such other method as may be recommended by the board and approved by the
commission.
     (b) Except for the first program year, the board shall determine, subject to commission
approval, the standard performance-based incentive for small- and medium-sized solar projects
from the average bid price from the last two (2) procurement enrollments conducted in the
commercial-scale and/or large-scale solar projects class. For the first program year, the board may
derive the standard performance incentive for small- and medium-sized solar projects from the
bidding data obtained from the distributed-generation program in effect in 2014 under the
provisions of chapter 26.2 of this title until there is bidding data from the first procurement under
the new program which shall then be used to set a new standard performance incentive. The
standard performance incentive may be set at a higher rate than payments for commercial-scale and
large-scale solar projects in order to take into account the potentially higher per-unit cost of smaller
projects. The standard performance incentive also shall be adjusted upward or downward, as
needed, in order to take into account the term length over which the incentive shall be paid for the
small- and medium-scale solar projects if such terms are different than the terms applicable to the
classes from which the standard performance incentive was derived.
     (c) For each program year, the board shall recommend to the commission a standard
performance incentive for each of the small-scale and medium-scale solar project classifications,
which performance incentives may span up to three program years. Upon receiving the
recommendations from the board, the commission shall open a docket to consider the
recommendations or address the recommendations in its approval process for the applicable
program year(s) in a consolidated docket as provided in § 39-26.6-10. The commission shall issue
its order approving the recommendations no later than concurrently with approval of the entire
program and tariffs applicable to the program year; provided, however, that the commission may
make modifications or changes to the board’s recommendations consistent with the legislative
purposes of this chapter.
     (d) If after the first program year, the applications for the medium-scale solar projects are
significantly over-subscribed, then the board and the electric distribution company, in consultation
with the office, may propose to the commission a bidding process for medium-scale projects or a
subset of the medium-scale projects under which project selections would be made based on the
lowest bids, rather than first-come, first-served or such other method previously approved by the
commission. The commission shall approve the proposal from the board and electric company
within ninety (90) days; provided, however, that the commission may make changes to the proposal
consistent with the legislative purposes of this chapter.
     (e) The commission shall approve the bidding process for medium-scale solar projects
recommended by the board only if the commission finds that such bidding process is in a
sufficiently simple form that is not administratively burdensome to bidders, and will not have the
effect of discouraging participation in the distributed-generation growth program by developers of
medium-scale solar projects that may be unrepresented by counsel.
     39-26.6-22. Zonal and other incentive payments.
     In order to provide the electric distribution company and the board with the flexibility to
encourage distributed-generation projects to be located in designated geographical areas within its
load zone where there is an identifiable system benefit, reliability benefit, or cost savings to the
distribution system in that geographical area, the electric distribution company, in consultation with
the board and the office, may propose to include an incentive-payment adder to the bid price of any
winning bidder that proposes a distributed-generation project in the desired geographical area. or
conservation benefit, or climate resilience benefit in that geographical area, the electric distribution
company, the board, or the office, shall propose to include an incentive-payment adder to the bid
price of any winning bidder that proposes a distributed-generation project in the preferred sites that
require remediation. The company, board, or office can also propose disincentive subtractors for
projects outside of preferred sites. The electric distribution company also may propose other
incentive payments to achieve other technical or public policy objectives that provide identifiable
benefits to customers. Any incentive-payment adders must be approved by the commission, and
shall not be counted as part of the bid price when the bids are selected at an enrollment event.
     39-26.6-25. Forecasted rate and reconciliation.
     (a) Three (3) months prior to the beginning of the first program year On or before
November 15 of each year, the electric distribution company shall file a forecast of the total amount
of payments that is likely to be paid out to distributed-generation projects in the coming program
year within the electric distribution company’s load zone, along with any costs permitted for
recovery pursuant to §§ 39-26.6-4, 39-26.6-13, and 39-26.6-18. The total of all forecasted payments
and costs shall be aggregated, net of forecasted revenues from the sale of the energy, renewable
energy certificates, and any other market products from the distributed-generation projects
participating in the performance-based incentive program. The forecasted net-aggregate amount
shall be used to design a fixed monthly charge per customer to recover the net forecast in rates
charged to all distribution customers during the prospective calendar year, which fixed charge may
be different by rate class in order to reasonably and equitably spread the program costs across all
customer classes. The fixed rate shall stay in effect until changed after the first reconciliation filing
set forth below and the rate reconciliation process shall be repeated annually, as set forth below.
The commission, in its discretion, may move the reconciliation of costs and credits under § 39-
26.1-5(f) into this reconciliation in order to have one reconciliation of all program costs and credits
from the long-term contracting standard, distributed-generation standard contracting, and
renewable energy growth program.
     (b) Within three (3) months after the end of each program year, the electric distribution
company shall file a report with the public utilities commission that reconcile reconciles the total
amount recovered from distribution customers against the total of net payments and costs for the
prior program year for review and approval. The electric distribution company shall file the
reconciliation with a report, along with a new forecast of payments to be made for the next twelve-
month (12) period, net of forecasted revenues for the resale of energy, renewable energy
certificates, or any other market attributes sold by the electric distribution company. The forecast
shall be used to set a new rate in the same manner as set forth above and the new rate shall remain
in effect until rates are reset in the next annual reconciliation and the reconciliation balance shall
be reflected in the new rate.
     SECTION 3. This act shall take effect upon passage.
========
LC002574/SUB A/2
========