| Chapter 097 |
| 2018 -- H 7807 SUBSTITUTE A Enacted 06/28/2018 |
| A N A C T |
| RELATING TO PUBLIC UTILITIES AND CARRIERS -- PUBLIC UTILITIES COMMISSION |
| Introduced By: Representatives Marshall, Cunha, Kennedy, and Costantino |
| Date Introduced: February 28, 2018 |
| It is enacted by the General Assembly as follows: |
| SECTION 1. Section 39-1-27.7 of the General Laws in Chapter 39-1 entitled "Public |
| Utilities Commission" is hereby amended to read as follows: |
| 39-1-27.7. System reliability and least-cost procurement. |
| Least-cost procurement shall comprise system reliability and energy efficiency and |
| conservation procurement, as provided for in this section, and supply procurement, as provided |
| for in § 39-1-27.8, as complementary but distinct activities that have as common purpose meeting |
| electrical and natural gas energy needs in Rhode Island, in a manner that is optimally cost- |
| effective, reliable, prudent, and environmentally responsible. |
| (a) The commission shall establish not later than June 1, 2008, standards for system |
| reliability and energy efficiency and conservation procurement, which that shall include |
| standards and guidelines for: |
| (1) System reliability procurement, including but not limited to: |
| (i) Procurement of energy supply from diverse sources, including, but not limited to, |
| renewable energy resources as defined in chapter 26 of this title; |
| (ii) Distributed generation, including, but not limited to, renewable energy resources and |
| thermally leading combined heat and power systems, which that is reliable and is cost-effective |
| cost effective, with measurable, net system benefits; |
| (iii) Demand response, including, but not limited to, distributed generation, back-up |
| generation, and on-demand usage reduction, which shall be designed to facilitate electric |
| customer participation in regional demand response programs, including those administered by |
| the independent service operator of New England ("ISO-NE"), and/or are designed to provide |
| local system reliability benefits through load control or using on-site generating capability; |
| (iv) To effectuate the purposes of this division, the commission may establish standards |
| and/or rates (A) for For qualifying distributed generation, demand response, and renewable |
| energy resources; (B) for For net-metering; (C) for For back-up power and/or standby rates that |
| reasonably facilitate the development of distributed generation; and (D) for For such other |
| matters as the commission may find necessary or appropriate. |
| (2) Least-cost procurement, which shall include procurement of energy efficiency and |
| energy conservation measures that are prudent and reliable and when such measures are lower |
| cost than acquisition of additional supply, including supply for periods of high demand. |
| (b) The standards and guidelines provided for by subsection (a) shall be subject to |
| periodic review and as appropriate amendment by the commission, which review will be |
| conducted not less frequently than every three (3) years after the adoption of the standards and |
| guidelines. |
| (c) To implement the provisions of this section: |
| (1) The commissioner of the office of energy resources and the energy efficiency and |
| resources management council, either or jointly or separately, shall provide the commission |
| findings and recommendations with regard to system reliability and energy efficiency and |
| conservation procurement on or before March 1, 2008, and triennially on or before March 1, |
| thereafter through March 1, 2024. The report shall be made public and be posted electronically on |
| the website to of the office of energy resources. |
| (2) The commission shall issue standards not later than June 1, 2008, with regard to plans |
| for system reliability and energy efficiency and conservation procurement, which standards may |
| be amended or revised by the commission as necessary and/or appropriate. |
| (3) The energy efficiency and resources management council shall prepare by July 15, |
| 2008, a reliability and efficiency procurement opportunity report which that shall identify |
| opportunities to procure efficiency, distributed generation, demand response, and renewables, |
| which report shall be submitted to the electrical distribution company, the commission, the office |
| of energy resources, and the joint committee on energy. |
| (4) Each electrical and natural gas distribution company shall submit to the commission |
| on or before September 1, 2008, and triennially on or before September 1, thereafter through |
| September 1, 2024, a plan for system reliability and energy efficiency and conservation |
| procurement. In developing the plan, the distribution company may seek the advice of the |
| commissioner and the council. The plan shall include measurable goals and target percentages for |
| each energy resource, pursuant to standards established by the commission, including efficiency, |
| distributed generation, demand response, combined heat and power, and renewables. The plan |
| shall be made public and be posted electronically on the website to of the office of energy |
| resources, and shall also be submitted to the general assembly. |
| (5) The commission shall issue an order approving all energy efficiency measures that are |
| cost effective and lower cost than acquisition of additional supply, with regard to the plan from |
| the electrical and natural gas distribution company, and reviewed and approved by the energy |
| efficiency and resources management council, and any related annual plans, and shall approve a |
| fully reconciling funding mechanism to fund investments in all efficiency measures that are cost |
| effective and lower cost than acquisition of additional supply, not greater than sixty (60) days |
| after it is filed with the commission. |
| (6) (i) Each electrical and natural gas distribution company shall provide a status report, |
| which shall be public, on the implementation of least-cost procurement on or before December |
| 15, 2008, and on or before February 1, 2009, to the commission, the division, the commissioner |
| of the office of energy resources, and the energy efficiency and resources management council |
| which may provide the distribution company recommendations with regard to effective |
| implementation of least-cost procurement. The report shall include the targets for each energy |
| resource included in the order approving the plan and the achieved percentage for energy |
| resource, including the achieved percentages for efficiency, distributed generation, demand |
| response, combined heat and power, and renewables, as well as the current funding allocations |
| for each eligible energy resource and the businesses and vendors in Rhode Island participating in |
| the programs. The report shall be posted electronically on the website of the office of energy |
| resources. |
| (ii) Beginning on November 1, 2012, or before, each electric distribution company shall |
| support the installation and investment in clean and efficient combined heat and power |
| installations at commercial, institutional, municipal, and industrial facilities. This support shall be |
| documented annually in the electric distribution company's energy efficiency program plans. In |
| order to effectuate this provision, the energy efficiency and resource management council shall |
| seek input from the public, the gas and electric distribution company, the economic development |
| corporation, and commercial and industrial users, and make recommendations regarding services |
| to support the development of combined heat and power installations in the electric distribution |
| company's annual and triennial energy efficiency program plans. |
| (iii) The energy efficiency annual plan shall include, but not be limited to, a plan for |
| identifying and recruiting qualified combined heat and power projects, incentive levels, contract |
| terms and guidelines, and achievable megawatt targets for investments in combined heat and |
| power systems. In the development of the plan, the energy efficiency and resource management |
| council and the electric distribution company shall factor into the combined heat and power plan |
| and program, the following criteria: (A) Economic development benefits in Rhode Island, |
| including direct and indirect job creation and retention from investments in combined heat and |
| power systems; (B) Energy and cost savings for customers; (C) Energy supply costs; (D) |
| Greenhouse gas emissions standards and air quality benefits; and (E) System reliability benefits. |
| (iv) The energy efficiency and resource management council shall conduct at least one |
| public review meeting annually, to discuss and review the combined heat and power program, |
| with at least seven (7) business day's days’ notice, prior to the electric and gas distribution utility |
| submitting the plan to the commission. The commission shall evaluate the submitted combined |
| heat and power program as part of the annual energy efficiency plan. The commission shall issue |
| an order approving the energy efficiency plan and programs within sixty (60) days of the filing. |
| (d) If the commission shall determine that the implementation of system reliability and |
| energy efficiency and conservation procurement has caused, or is likely to cause, under or over- |
| recovery of overhead and fixed costs of the company implementing said procurement, the |
| commission may establish a mandatory rate adjustment clause for the company so affected in |
| order to provide for full recovery of reasonable and prudent overhead and fixed costs. |
| (e) The commission shall conduct a contested case proceeding to establish a |
| performance-based incentive plan which that allows for additional compensation for each electric |
| distribution company and each company providing gas to end-users and/or retail customers based |
| on the level of its success in mitigating the cost and variability of electric and gas services |
| through procurement portfolios. |
| (f)(1) The office of energy resources shall conduct a study and analysis of the electric and |
| gas distribution company's state energy efficiency programs that will examine implemented |
| program and planned conservation measures and review and confirm the claimed energy savings. |
| In carrying out this study, the office shall utilize a representative sample of different customer |
| classes and measures that have and/or will be participating in the state energy efficiency |
| programs. At a minimum, the study performed by the office of energy resources shall include the |
| following in its scope of work: |
| (i) Independently review and summarize the electric and gas distribution company |
| process for incorporating results from completed evaluation studies into on-going energy |
| efficiency program reporting and implementation. |
| (ii) Conduct an independent review of gas and electricity efficiency programs, which |
| may include billing analysis techniques. The scope and subjects of this analysis will be decided |
| by the working group with input and advice from an independent consultant. The analysis will be |
| conducted by a qualified independent consultant using industry accepted methods. |
| (iii) Review the data-collection practices, including metering equipment used,; sampling |
| frequency,; sample sizes,; and data validation procedures, and the methods for data analysis |
| employed, as deemed appropriate by the independent evaluator. |
| (iv) Study results and recommendations will be presented to the public utilities |
| commission and the energy efficiency and resource management council. |
| (2) The office of energy resources shall consult with the working group in development |
| of the request for proposals (RFP), and during the course of the study, including the preliminary |
| study results. The working group shall be comprised of one representative from each of the |
| following groups chosen by the office of energy resources: |
| (i) Large commercial and industrial energy users; |
| (ii) Small business energy users; |
| (iii) Residential energy users; |
| (iv) Municipal and state energy users; |
| (v) Low-income energy users; |
| (vi) Electric and gas distribution company; and |
| (vii) Energy efficiency and resource management council. |
| (3) The office of energy resources, in consultation with the electric and gas distribution |
| company and representatives referenced in § 39-1-27.7(f)(2) subsection (f)(2), shall be |
| authorized to hire an energy consulting company or firm to carry out the energy efficiency |
| verification study. The costs associated with this study, including, but not limited to, those |
| associated with the consultant or firm contract and reasonable administrative costs incurred by the |
| office in the execution of subsection (f) of this section, shall be recoverable through the system |
| benefit charge subject to commission approval. Funding shall be transferred from the electric and |
| gas distribution utility to the office of energy resources upon request by the office. |
| (4) The office of energy resources shall submit this report on or before October 30, 2019, |
| to the governor, the president of the senate, and the speaker of the house. The office and its |
| selected energy consulting company or firm shall host two (2) public presentations on the |
| preliminary and final results of the study. |
| SECTION 2. This act shall take effect upon passage. |
| ======== |
| LC004998/SUB A/2 |
| ======== |