2019 -- H 5692

========

LC001689

========

     STATE OF RHODE ISLAND

IN GENERAL ASSEMBLY

JANUARY SESSION, A.D. 2019

____________

A N   A C T

RELATING TO PUBLIC UTILITIES AND CARRIERS - EXCAVATION NEAR

UNDERGROUND UTILITY FACILITIES

     

     Introduced By: Representatives Morin, Vella-Wilkinson, Phillips, Diaz, and Ackerman

     Date Introduced: February 27, 2019

     Referred To: House Corporations

     It is enacted by the General Assembly as follows:

1

     SECTION 1. Section 39-1.2-7 of the General Laws in Chapter 39-1.2 entitled

2

"Excavation Near Underground Utility Facilities" is hereby amended to read as follows:

3

     39-1.2-7. Marking of underground utilities and excavations.

4

     (a) A public utility served with the notice in accordance with ยง 39-1.2-5 shall, within

5

seventy-two (72) hours, exclusive of Saturdays, Sundays, and legal holidays, of the receipt of the

6

notice, unless otherwise agreed between the person or public agency performing the work and the

7

public utility, mark the approximate location of the underground utility facilities.

8

     (b) Prior to notifying the association, any excavator must premark the area of proposed

9

excavation in a manner that will enable the owner of the public utility facilities to identify the

10

boundaries of the proposed excavation activities, except that premarking shall not be required if

11

the proposed excavation will be continuous and exceed five hundred feet (500') in length, or if

12

such marks may reasonably interfere with traffic or pedestrian control or are misleading to the

13

general public.

14

     (c) A public utility shall mark any of their underground utility facilities that are located

15

within fifteen feet (15') of the exterior limits of the premarked excavation area.

16

     (d) For the purposes of this chapter, the approximate location of underground utility

17

facilities shall be marked with stakes, paint, or other physical means as may be necessary to

18

ensure a distinctive mark. The public utility shall follow the color coding prescribed in this

 

1

section.

2

UTILITY AND TYPE OF PRODUCT SPECIFIC GROUP IDENTIFYING COLOR

3

Electric power distribution and transmission Safety Red

4

State and municipal electric systems Safety Red

5

Gas distribution and transmission High Visibility Safety Yellow

6

Dangerous materials, product line High Visibility Safety Yellow

7

Telephone and telegraph systems Safety Alert Orange

8

Water systems Safety Precaution Blue

9

Cable antenna television Safety Alert Orange

10

Premark White

11

     (e) In the event the excavator shall damage the underground public utility facilities as the

12

result of an incorrect marking by the public utility, the excavator shall not be responsible for the

13

resulting damage.

14

     (f) In the event of an incorrect marking, the public utility or its contractor shall reimburse

15

the excavator for the lost time expense incurred, inclusive of manpower and equipment, resulting

16

from the incorrect marking.

17

     SECTION 2. This act shall take effect upon passage.

========

LC001689

========

 

LC001689 - Page 2 of 3

EXPLANATION

BY THE LEGISLATIVE COUNCIL

OF

A N   A C T

RELATING TO PUBLIC UTILITIES AND CARRIERS - EXCAVATION NEAR

UNDERGROUND UTILITY FACILITIES

***

1

     This act would require any public utility or its contractor to reimburse an excavator for

2

lost time expense incurred, including manpower and equipment from the utilities incorrect

3

marking of underground utilities.

4

     This act would take effect upon passage.

========

LC001689

========

 

LC001689 - Page 3 of 3